My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 RIVERSIDE RD 2023-01-30
>
Address Records
>
RIVERSIDE RD
>
405
>
405 RIVERSIDE RD 2023-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 12:03:59 PM
Creation date
10/14/2021 5:14:24 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.9 Element 9: Control Pollutants <br /> The following pollutants are anticipated to be present on-site: <br /> Table 2— Pollutants <br /> Pollutant (List pollutants and source, if applicable) <br /> Concrete <br /> Diesel Fuel <br /> Asphalt <br /> Building, insulation, and roofing materials <br /> All pollutants, including waste materials and demolition debris, that occur onsite shall be <br /> handled and disposed of in a manner that does not cause contamination of stormwater. Good <br /> housekeeping and preventative measures will be taken to ensure that the site will be kept clean, <br /> well-organized, and free of debris. If required, BMPs to be implemented to control specific <br /> sources of pollutants are discussed below. <br /> Chemical storage: <br /> I . Any chemicals stored in the construction areas will conform to the appropriate <br /> source control BMPs listed in Volume IV of the Ecology stormwater manual. In <br /> Western WA, all chemicals shall have cover, containment, and protection <br /> provided on site, per BMP C153 for Material Delivery, Storage and Containment <br /> in SWMMWW 2005 <br /> I . Application of agricultural chemicals, including fertilizers and pesticides, shall be <br /> conducted in a manner and at application rates that will not result in loss of <br /> chemical to stormwater runoff. Manufacturers' recommendations for application <br /> procedures and rates shall be followed. <br /> Excavation and tunneling spoils dewatering waste: <br /> I . Dewatering BMPs and BMPs specific to the excavation and tunneling (including <br /> handling of contaminated soils)are discussed under Element 10. <br /> Demolition: <br /> ■ Dust released from demolished sidewalks, buildings, or structures will be <br /> Icontrolled using Dust Control measures (BMP C140). <br /> • Storm drain inlets vulnerable to stormwater discharge carrying dust, soil, or <br /> rY 9 <br /> debris will be protected using Storm Drain Inlet Protection (BMP C220 as <br /> described above for Element 7). <br /> Page 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.