My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 RIVERSIDE RD 2023-01-30
>
Address Records
>
RIVERSIDE RD
>
405
>
405 RIVERSIDE RD 2023-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 12:03:59 PM
Creation date
10/14/2021 5:14:24 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cbilized n <br /> I: Purpose Construction entrances are stabilized to the amount of sediment <br /> transported onto pavedEntrance roads byi vehicles orreduce equipment by constructing <br /> stabilized pad of quarry spalls at entrances to construction sites. <br /> ConditBMPions105:of Stabilized Use ConstructionCo entrstructionances shall be stabilized wherever traffic will bedi leavina g <br /> a construction site and traveling on paved roads or other paved areas <br /> within 1,000 feet of the site. <br /> On large commercial,highway, and road projects, the designer should <br /> include enough extra materials in the contract to allow for additional <br /> stabilized entrances not shown in the initial Construction SWPPP. It is <br /> difficult to determine exactly where access to these projects will take <br /> place; additional materials will enable the contractor to install them where <br /> needed. <br /> IDesign and • See Figure 4.2 for details. Note: the 100' minimum length of the <br /> Installation entrance shall be reduced to the maximum practicable size when the <br /> I Specifications size or configuration of the site does not allow the full length(100'). <br /> • A separation geotextile shall be placed under the spalls to prevent <br /> fine sediment from pumping up into the rock pad. The geotextile <br /> Ishall meet the following standards: <br /> Grab Tensile Strength(ASTM D4751) 200 psi min. <br /> I <br /> Grab Tensile Elongation(ASTM D4632) 30% max. <br /> Mullen Burst Strength(ASTM D3786-80a) 400 psi min. <br /> IAOS(ASTM D4751) 20-45(U.S. standard sieve size) <br /> • Consider early installation of the first lift of asphalt in areas that will <br /> I paved; this can be used as a stabilized entrance. Also consider the <br /> installation of excess concrete as a stabilized entrance. During large <br /> e <br /> concrete pours, excess concrete is often available for this purpose. <br /> • Hog fuel (wood-based mulch)may be substituted for or combined with <br /> quarry spalls in areas that will not be used for permanent roads. Hog <br /> fuel is generally less effective at stabilizing construction entrances and <br /> I should be used only at sites where the amount of traffic is very limited. <br /> Hog fuel is not recommended for entrance stabilization in urban areas. <br /> The effectiveness of hog fuel is highly variable and it generally <br /> Irequires more maintenance than quarry spalls. The inspector may at <br /> any time require the use of quarry spalls if the hog fuel is not <br /> preventing sediment from being tracked onto pavement or if the hog <br /> I <br /> fuel is being carried onto pavement. Hog fuel is prohibited in <br /> permanent roadbeds because organics in the subgrade soils cause <br /> degradation of the subgrade support over time. <br /> I • Fencing(see BMPs C103 and C 104) shall be installed as necessary to <br /> restrict traffic to the construction entrance. <br /> I <br /> 4-8 Volume ll—Construction Stormwater Pollution Prevention February 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.