Laserfiche WebLink
• Whenever possible, the entrance shall be constructed on a firm, <br /> compacted subgrade. This can substantially increase the effectiveness <br /> of the pad and reduce the need for maintenance. <br /> Maintenance • Quarry spalls (or hog fuel) shall be added if the pad is no longer in <br /> Standards accordance with the specifications. <br /> • If the entrance is not preventing sediment from being tracked onto <br /> pavement, then alternative measures to keep the streets free of <br /> sediment shall be used. This may include street sweeping, an increase <br /> in the dimensions of the entrance, or the installation of a wheel wash. <br /> • Any sediment that is tracked onto pavement shall be removed by <br /> shoveling or street sweeping. The sediment collected by sweeping <br /> shall be removed or stabilized on site. The pavement shall not be <br /> cleaned by washing down the street, except when sweeping is <br /> ineffective and there is a threat to public safety. If it is necessary to <br /> wash the streets, the construction of a small sump shall be considered. <br /> The sediment would then be washed into the sump where it can be <br /> controlled. <br /> • Any quarry spalls that are loosened from the pad, which end up on the <br /> roadway shall be removed immediately. <br /> • If vehicles are entering or exiting the site at points other than the <br /> construction entrance(s), fencing(see BMPs C103 and C 104) shall be <br /> installed to control traffic. <br /> • Upon project completion and site stabilization, all construction <br /> accesses intended as permanent access for maintenance shall be <br /> permanently stabilized. <br /> Driveway shall meet the <br /> requirements of the <br /> permitting agency <br /> It is recommended that <br /> the entrance be <br /> crowned so that runoff <br /> oad drains off the pad <br /> �y1s,a9P <br /> „l�fl� <br /> • <br /> I r <br /> Install driveway culvert \'i� <br /> if there Is a roadside ``0 2:_�,'• !� <br /> ditch present �� �'�� <br /> 4"-8"quarry spells <br /> Geotextile <br /> 12"min.thickness J <br /> Provide full width of <br /> ingress/egress area <br /> Figure 4.2—Stabilized Construction Entrance <br /> February 2005 Volume 11—Construction Stormwater Pollution Prevention 4-9 <br />