My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2022-05-13
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
ADMIN BLDG WEST
>
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 10:40:58 AM
Creation date
10/15/2021 9:33:59 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
ADMIN BLDG WEST
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• May 23, 2018 <br /> Mr.Tony Lee <br /> Snohomish County Courthouse Renovation/Addition <br /> ge <br /> 2) The air barrier and the testing requirements of the barrier noted in Section C402.5.1.2 <br /> should be shown on the plans. <br /> Response:Air barrier testing has been added to section "3.5 Field Quality Control"in spec <br /> section 072726 "Fluid-Applied Membrane Air Barriers". Spec section 072726 has been <br /> attached to this letter. This testing requirement has also been included on Sheet GI-103. <br /> STRUCTURAL <br /> 1) The structural design is currently under review. Calculations for the project have only <br /> recently been received. The review will continue with any comments forwarded under <br /> separate letter. <br /> Response:Comment acknowledged. <br /> 2) The addition is shown to have been designed as a seismic risk category II building. Please <br /> discuss why the building is not a risk category III structure [the building has a primary <br /> • occupancy is public assembly and the overall building(addition plus existing) has an <br /> occupant load exceeding 5000]. Table 1604.5 <br /> Response: The occupant load for the building is only 2,932 occupants, therefore the <br /> occupant load of 5,000 would not apply. Likewise, IBC Table 1604.5 states that this table <br /> applies to "buildings and other structures with a primary occupancy that is public assembly <br /> with an occupant load greater than 300."The IBC code commentary explains that a <br /> method of determining if the primary occupancy is assembly would be by"verifying that <br /> the portion of the building housing the public assembly occupancy is more than 50 <br /> percent of the total building area."For this project, the areas of public assembly amount to <br /> only 27%of the total building area. Therefore, in accordance with the code commentary <br /> mentioned above, the primary occupancy is not assembly and Table 1604.5 is not <br /> applicable in this instance. <br /> *** End of Comments*** <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.