My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2022-05-13
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
ADMIN BLDG WEST
>
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 10:40:58 AM
Creation date
10/15/2021 9:33:59 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
ADMIN BLDG WEST
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bob Egleston <br />August 2, 2018 <br />'Page 3 <br />Structure Comment <br />15. This comment does not appear to be <br />addressed by the submitted calculations as <br />indicated. Please specify the pertinent <br />calculation pages for each comment. <br />Original Comment 15a: <br />Additional documentation for the design of the <br />shear wall foundation at Grid C18- 7 7 should be <br />submitted for review. See IBC Section 1604.4. <br />The following comments should be addressed. - <br />a. The foundation appears to be designed <br />as a monolithic element. However, the <br />foundation encases three existing gravity <br />footings. The foundation should be evaluated <br />considering its actual geometry, including <br />discontinuities in its structure. <br />Response: See attached supplemental <br />calculations (Shear Wall Foundations), <br />b. The foundation is anticipated to have <br />rigid bearing zones at the ends due to the <br />micropiles. The foundation shall be designed as <br />needed by analysis to span between the ends and <br />distribute vertical loads to the piles. <br />Response: See attached supplemental <br />calculations (Sheor Wall Foundations). <br />C. The load path between the shear wall <br />and the continuous sides of the foundation shall <br />be substantiated <br />Response.: See attached supplemental <br />calculations (Shear Wall Foundations). <br />MAGNUSSON <br />KLEMENCIC <br />ASSOCIATES <br />MKA Response <br />At locations where the foundation encases <br />existing footings, the foundation region above the <br />existing footing was designed as a pile cap with <br />strut and tie modeling in order to account for the <br />discontinuities (See previously submitted <br />calculation pages 1061-1062). <br />The foundation elements were designed with the <br />micropiles accounted for as point supports with <br />an assigned spring constant matching the <br />recommendations of the geotechnical engineer. <br />See previously submitted calculations sheet 1004 <br />for geotechnical engineer's recommendation for <br />micropile spring stiffness. Foundation bearing <br />stresses are distributed to the micropiles and <br />surrounding soil based on relative stiffness and <br />the concrete foundation design is consistent with <br />this distribution. See previously submitted <br />calculation sheet 1011 for the corresponding <br />point spring stiffness used in the SAFE model. <br />See previously submitted calculations (pages <br />1061-1062). The portion of the new footing <br />above the existing footing was designed as a <br />shallow depth pile cap. Bottom steel was added <br />on the previously submitted drawings to "bridge' <br />over the existing footing. The bottom <br />reinforcement on either side of the existing <br />footing runs continuous over the entire length of <br />the new footing and satisfies the demands <br />determined from the SAFE model. <br />
The URL can be used to link to this page
Your browser does not support the video tag.