My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2022-05-13
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
ADMIN BLDG WEST
>
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 10:40:58 AM
Creation date
10/15/2021 9:33:59 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
ADMIN BLDG WEST
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bob Egleston <br />6ugust.2, 2018 <br />Page 2 <br />Structure Comment <br />14b. The following should be addressed: <br />MKA Response <br />MAGNUSSON <br />KLEMENCIC <br />ASSOCIATES <br />The design of the piles appears to be a i. "Deferred Structural Submittals" section <br />deferred submittal. The piles should be of the general notes on Sheet S-003 of <br />listed on Sheet 5-003 in the "Deferred the drawings submitted with the original <br />Structural Submittals" section. comment responses included micropiles <br />as a deferred structural submittal <br />ii. The pile design loads appear to exceed <br />the values specified in Table 7/S-401. <br />The tabulated values and the calculated <br />loads both appear to be ASD values. <br />See calculation pages 1047-1048 and <br />1055-1056, and page 15 of the <br />geotechnical report. <br />H. The micropile forces shown on pages <br />1047-1048 are strength level forces (The <br />sheet header is mislabeled as service <br />level forces). The micropile design <br />capacities shown on 7/S-401 are service <br />level forces and are equivalent to the <br />strength level forces divided by 1.5. For <br />clarity, the affected calculation pages <br />have been corrected and resubmitted <br />with this response letter. <br />iii. Verify the correct micropile types are iii. (4) micropiles on plan were labeled <br />specified for each location on Sheet S- incorrectly and have been corrected. <br />200. The revised sheet is included with this <br />response letter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.