Laserfiche WebLink
NOTES: <br />1. FRAMING PER ARCH. <br />2. ROOFING MEMBRANE INSTALL AND <br />TERMINATE PER MFR. <br />SIDING PER ELEVATION <br />FURRING <br />PRIMARY W.R.B. <br />NTEMOR <br />EXTEMOR <br />SEALANT-5 <br />MTL FLASHING <br />lk <br />ROOFING MEMBRANE <br />'MIN SLOPE X":12" MIN. <br />-q, <br />F R20 MIN RIGID <br />f INSULATION <br />4I- <br />]-I ROOF VAPOR BARRIER <br />SECTION: BASE OF WALL @_ROOF <br />SCALE:NTS <br />©COPYRIGHT BEECON$ULTING <br />NOTES <br />1. FRAMING PER ARCH <br />2. *WET SET L—ANGLE IN SEALANT-1 <br />3. MEMBRANE INSTALLATION, <br />TRANSITION, AND TERMINATION PER <br />MFR RECOMMENDATIONS <br />NOTES: <br />1. FRAMING PER ARCH, <br />2. ROOFING MEMBRANE INSTALL AND <br />TERMINATE PER MFR. <br />INTEMOR <br />EXTEMOR <br />SIDING PER ELEVATION <br />FURRING <br />ESSIVE FOAM <br />SEALANT-5 <br />DOOR PER SCHEDULE <br />:D L—ANGLE* <br />PRIMARY W.R.B. <br />�_. \ <br />SEALANT-5 <br />PAVERS ON PEDESTALS <br />\ <br />MTL FLASHING <br />PROTECTION BOARD <br />H ROOFING MEMBRANE <br />MIN. <br />SLOPE )/4": 12" MIN. PAVERS ON PEDESTAL <br />1 MIN <br />SLOPE TO <br />—7 <br />7T Al N: Y4.": 12 " M I N, <br />T] <br />PROTECTION BOARD <br />�--j <br />T-RF <br />ROOFING MEMBRANE <br />--- R20 MIN RIGID <br />INSULATION <br />7- <br />ROOF VAPOR BARRIER <br />7— 1 <br />R20 MIN RIGID INSULATION <br />ROOF VAPOR BARRIER <br />SCALE:NTS <br />© COPYRIGHT BEE CONSULTING <br />ROOFING MEMBRANE <br />R20 MIN RIGID INSULATION <br />ROOF VAPOR BARRIER <br />SLOPE <br />6"MIN <br />606 SECT�ON. BASE OF WALL @ROOF W/PAVERS <br />(TYRCAL) <br />SCALE:NTS <br />©COPYRIGHT BEE CONSULTING <br />NOTES: <br />1. FRAMING PER ARCH <br />ROOF DRAIN 2. ROOFING INSTALL & <br />TERMINATON PER ROOFING MFR. <br />3. DRAIN PIPE SUPPORT PER <br />OTHERS <br />1"MIN. <br />u <br />T- F�— <br />-4, <br />----- ------------------- <br />609 � SECTION. DRAWN w/ OVERFLOW AT ROOF <br />7 (TYPICAL) <br />SCALE:NTS <br />©COPYRIGHT SEE CONSULTING <br />SPRAY FOAM INSULATION, <br />P20 MIN AROUND PIPE AND <br />PENETRATION <br />OVERFLOW DRAIN <br />OVER FLOW GUARD <br />SLOPE <br />�Y-12WMIN. <br />RAILING PER ARCH, <br />FASTEN PER STRUCT <br />22ga METAL COPING W/ <br />HEMMED DRIP EDGES & <br />STANDING SEAMS @ JOINTS <br />El <br />"MINA <br />GASKETED FASTENER <br />WITH SPACER <br />EXTEMOR <br />NEOPRENE WASHER <br />NEOPRENE PAD <br />1/0 <br />ADHESIVE FASTENER PER <br />STRUCT <br />Po <br />ROOFING MEMBRANE <br />PAVERS & <br />PEDESTAL <br />PROTECTION <br />BOARD <br />SLOPE TO <br />DRAIN: X": 12"MIN. <br />R20 MIN RIGID <br />INSULATION <br />ROOF VAPOR <br />BARRIER <br />SPRAY FOAM <br />INSULATION, <br />R20 MIN <br />ROOF <br />INSULATION <br />■ <br />�Y4": 12"SLOPE MIN. <br />SECTION: PARAPET W1 RAL <br />SCALE: NTS <br />Oc COPYRIGHT BEE CONSULTING <br />J/2"GAP <br />4"MIN. <br />GASKETED FASTENER <br />W/ CLEAT @ 24"O.C. <br />;V2"MIN <br />PRIMARY W.R.B. <br />POUR IN PLACE FOAM <br />FURRING <br />SIDING PER <br />ELEVATION <br />6"MIN <br />SEALANT-5 <br />PRIMARY W.R.B. <br />EXTERIOR <br />610 �SECT�ON: DRAIN w/ OVERFLOW AT ROOF"// <br />PAVERS <br />SCALE:NTS <br />©COPYRIGHT BEE CONSULTING <br />12"SLOPE MIN <br />22ga METAL COPING W/ <br />HEMMED DRIP EDGES & <br />STANDING SEAMS @ JOINTS <br />4"MIN <br />GASKETED FASTENER <br />WITH SPACER <br />EXTERIOR <br />ROOFING MEMBRANE <br />SLOPE TO <br />DRAIN:X`: 12"MIN. <br />/ N/ <br />R20 MIN RIGID I <br />INSULATION <br />ROOF VAPOR <br />BARRIER j, <br />j <br />r <br />SPRAY FOAM <br />INSULATION, <br />R20 MIN <br />Y <br />6"MIN. <br />ROOF <br />INSULATION <br />R20 <br />NTEMOR <br />608 SECTION: PARAPET <br />(TYPICAL) <br />SCALE:NTS <br />Q COPYRIGHT BEE CONSULTING <br />N <br />/'2"GAP <br />4"MIN. <br />GASKETED FASTENER <br />W/ CLEAT @ 24"O.C. <br />Y2"MIN <br />NOTES: <br />1. FRAMING PER ARCH. <br />2. ROOFING MEMBRANE <br />INSTALL AND TERMINATE <br />PER MFR RECOMMENDATION <br />I. PRIMARY W.R.B. <br />POUR IN PLACE FOAM <br />41 FURRING <br />Ij SIDING PER <br />II ELEVATION <br />6"MIN <br />II <br />\] - SEALANT-5 <br />r F <br />PRIMARY W.R.B. <br />EXTEMOR <br />I'lu 1 r z' 1. FRAMING PER ARCH <br />2. ROOFING INSTALL & <br />TERMINATION PER ROOFING MFR. <br />3. DRAIN PIPE SUPPORT PER <br />OTHERS <br />BULDNG ENVELOPE <br />ENG�NEERNG <br />LLJ <br />u <br />cy) <br />< <br />V) <br />00 <br />Z <br />0) <br />0 <br />2 <br />L,L <br />Uj <br />F- <br />< <br />< <br />3: <br />V) <br />THE UNDERSIGNED HAS PROVIDED BUILDING ENCLOSURE DOCUMENTS THAT IN MY PROFESSIONAL JUDGEMEN, <br />ARE APPROPRIATE TO SATISFY THE REQUIREMENTS OF RCIN64L55.005 THROUGH RCVV64.55,090 <br />Alt, <br />Gj <br />is 10 i, N I <br />ok R U ca, <br />03.29.2019 HUDFIRIMAPPUCATEON <br />11.07.2018 CONSTRUCTION SET <br />0712.2018 GNIP SET <br />03.01.2018 75% CD SET <br />BEE PROJECT #: 1802-1014 <br />P. E,: Jim C.Freeling ENERGY: Telman Gasanov <br />P.M.: Jim C.Freeling <br />DRAFTER: Stephen Pdiedri <br />C COPYRIGHT BEE CONSULTHNG <br />THESE DRAWINGS ARE FOR GENERAL ARRANGEMENT OF MATERIALS ONLY. <br />SITE CONDITIONS GOVERN, DO NOT SCALE DRAVVINGS TO OBTAIN DIMENSIONS. <br />ROOF DETAILS <br />SHEET: <br />