Laserfiche WebLink
3"MIN <br />------------ CUT -EDGE SEAL <br />ANT PER <br />ROOFING MANUFACTURER <br />8"MIN. <br />R20 MIN RIGID <br />INSULATION <br />8"MIN. <br />R20 MIN SPRAY FOAM <br />4"MIN <br />ft <br />7__ <br />M_ <br />NOTES: <br />1. FRAMING PER ARCH. <br />2. ROOFING INSTALL & <br />TERMINATE PER ROOFING MFR. <br />VENT HOOD PER MANUFACTURER <br />WATER CUT-OFF MASTIC <br />PER MANUFACTURER <br />S.S. DRAW BAND <br />PRESSURE SENSITIVE TAPE <br />PER ROOFING MANUFACTURER <br />FLANGE, PRIME ALL SIDES <br />ROOFING MEMBRANE PRIMED <br />& HOT AIR -WELDED 1j" MIN, <br />PER ROOFING MANUFACTURER <br />@ FLASHING & SEAMS <br />ROOF VAPOR <br />BARRIER <br />SLOPE TO DRAIN -- <br />1/4".- 12"MIN . <br />77 <br />1M <br />SECTION: VENT PENETRATION A ROO <br />SCALE:NTS <br />©COPYRIGHT BEE CONSULTING <br />RAILING PER ARCH, <br />FASTEN PER STRUCT <br />22go METAL COPING W/ <br />HEMMED DRIP EDGES & <br />STANDING SEAMS @ JOINTS <br />GASKETED FASTENER <br />WITH SPACER <br />EXTEMOR <br />NEOPRENE WASHER <br />NEOPRENE PAD <br />ADHESIVE FASTENER PER <br />STRUCT <br />Z�111111�0 <br />1 2"SLOPE MIN. <br />A <br />4 <br />PAVERS &pb <br />PEDESTAL <br />SLOPE TO <br />-- — - <br />DRAIN:)/4": 12'MIN. <br />- — <br />PROTECTION <br />BOARD <br />R20 MIN RIGID J, <br />INSULATION <br />ROOF VAPOR <br />SPRAY FOAM <br />INSULATION, <br />R2M(W <br />INSULATIONN <br />R20 M <br />6"MIN. <br />8"MIN, <br />SEqT CIM PARAPET W1 RAi/. <br />L_ <br />I Yt-IUAL) <br />SCALE:NTS <br />©COPYRIGHT BEE CONSULTING <br />)/2."GAP <br />4"MIK <br />GASKETED FASTENER <br />W/ CLEAT 0 24"O.C. <br />)�"MIN <br />1"MIN <br />SIDING PER ELEVATION <br />FURRING <br />PRIMARY W.R.B. <br />- -SEALANT-5 <br />SCALE:NTS <br />©COPYRIGHT BEE CONSULTING <br />SLOPE TO DRAIN <br />1 /4:12 <br />S. A. M. 2 <br />FURRING <br />SIDING PER ELEVATION <br />SEALANT-5 <br />PRIMARY W.R.B <br />ROOF VAPOR BARRIER <br />FLASHING PRECOATED <br />W/ ROOFING MEMBRANE <br />ROOFING MEMBRANE <br />W.R.B. LINER <br />SEALANT-5 <br />NOTES: <br />1. FRAMING PER ARCH <br />2. ROOFING INSTALL & <br />TERMINATION PER <br />ROOFING MFR. <br />1"MIN <br />8"MIN. <br />SLOPE TO DRAIN <br />X,": 12"M IN <br />REF.ARCH <br />14/A700 <br />111 <br />SCALE:NTS <br />©COPYRIGHT BEE CONSULTING <br />h. SEALANT PER ROOFING <br />MANUFACTURER <br />S.S. DRAW BAND PRESSURE SENSITIVE TAPE <br />PER ROOFING MANUFACTURER <br />SLOPE TO DRAIN <br />Y4"- 12"MIN, <br />LROOFING MEMBRANE <br />R20 MIN RIGID <br />INSULATION <br />ROOF VAPOR BARRIER <br />ATTACHED PER STRUCT <br />R20 MIN SPRAY FOAM <br />INSULATION <br />VENT CELLS @ <br />EVERY HEAD <br />JOINT <br />PRIMARY WR.B. <br />POUR IN PLACE FOAM <br />AIR SPACE <br />MASONRY VENEER <br />SEALANT-5 <br />PRIMARY W.R.B <br />BULNG ENVELOPE <br />EDNGNEERNG <br />THE UNDERSIGNED HAS PROVIDED BUILDING ENCLOSURE DOCUMENTS THAT IN MY PROFESSIONAL JUDGEMEV <br />ARE APPROPRIATE TO SATISFY THE REQUIREMENTS OF ROW 64.55 005 THROUGH RCW 64.55 090. <br />SFT <br />RUC T 10 11 fl, 16M <br />03.29.2019 HUD FIRM APPLICATION <br />11.07.2018 CONSTRUCTION SET <br />07.12.2018 GMP SET <br />03.01.2018 75% CD SET <br />BEE PROJECT#: 1802-1014 <br />P.E.: Jim C.Freeling ENERGY: Tel man Gasanov <br />P.M.: Jim C.Freeling DRAFTER: <br />Stephen Polledri <br />0 COPYRIGHT BEE CONSULTING <br />THESE DRAWINGS ARE FOR GENERAL ARRANGEMENT OF MATERIALS ONLY, <br />SITE CONDITIONS GOVERN. DO NOT SCALE DRAWINGS TO OBTAIN DIMENSIONS. <br />ROOF DETAILS <br />SCALE: NTS <br />©COPYRIGHT BEE CONSULTING <br />