My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Buell Recreation 10/3/2021
>
Contracts
>
Agreement
>
Buell Recreation 10/3/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2021 1:05:41 PM
Creation date
10/22/2021 1:05:22 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Buell Recreation
Approval Date
10/3/2021
Council Approval Date
9/8/2021
Department
Purchasing
Department Project Manager
Jenny Chang
Subject / Project Title
Doyle Park Playground Improvement 2018-109
Tracking Number
0003066
Total Compensation
$313,424.10
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Buell Recreation LLC <br /> 7327 SW Barnes Rd#601 Quote <br /> Portland,OR 97225 <br /> +1 5039221650 <br /> admin@buellrecreation.com 1 ,. <br /> al II ecr t I <br /> ADDRESS SHI P TO <br /> Everett,City Doyle Park <br /> Accounting Division 3420 Grand Ave <br /> P.O.Box 12130 Everett,WA 98201 <br /> Everett,WA 98206-2130 <br /> QUOTE# DATE EXPIRATION DATE <br /> R21-0116D 08/24/2021 09/24/2021 <br /> SALES REP PROJECT <br /> Kevin Doyle Park <br /> ACTIVITY QTY RATE AMOUNT <br /> Play Stru ue 1 39,194.00 39,194.00T <br /> BCI Burke Structure as per proposal#907-140368-2 a Nucleus <br /> Basics Playground Design recommended for ages 2-12. <br /> KCDA DISCOUNT 1 -2,744.00 -2,744.00T <br /> KCDA Contract Discount,Contract# 18-315 Playground <br /> Equipment and Matting. <br /> Surface Mout 1 1,500.00 1,500.00T <br /> Additional cost for Surface Mount <br /> Freight 1 3,800.00 3,800.00T <br /> Shipping <br /> Demo 1 32,992.00 32,992.00T <br /> Remove/demo two play areas and dispose existing curbs around <br /> two play areas. Existing sites to be filled with excavated materials <br /> and 6"topsoil. <br /> Sltenrcrk 1 133,515.00 133,515.00T <br /> -Provide Security Fencing and Portable Restroom <br /> -Remove and dispose of existing play equipment. <br /> -Excavate new area 32'x60"x 18"deep. <br /> -Spread dirt over existing wood chips in two areas. <br /> -Form and pour 8"x 12"concrete curb 32'x60'with 1"weep holes <br /> on 4'centers on three sides. <br /> -Supply and install washed drain Rock minimum 2"depth. <br /> -Pour 2,030 square feet 3"minimum thick concrete pad at 3,000 <br /> psi. <br /> -Trench around three sides of new play area and trench to <br /> Northwest corner of existing wood chip area and install 6"pvc <br /> drain pipe with drain Rock as per plans,with three cleanouts and a <br /> 3'dry well per plans provided(2021-08-11;LI.0). <br /> -Backfill curbs with minimum 4"top soil and grass seed. <br /> -Hydroseed all disturbed areas. <br /> -Add 12"yard drain <br /> -Add 4"tight line from yard drain to 6"line <br /> -Remove 8'x 8'concrete pad and dispose <br /> -Fill and grade area where concrete pad was <br /> Fax:866-597-0033 I 1-800-266-1250 I 1-800-266-1250 <br />
The URL can be used to link to this page
Your browser does not support the video tag.