My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc. 10/15/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
Perteet Inc. 10/15/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2021 3:34:31 PM
Creation date
10/22/2021 3:33:58 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc.
Approval Date
10/15/2021
End Date
12/30/2023
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Silver Lake Trail
Tracking Number
0003077
Total Compensation
$10,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement with Perteet Inc. October,2021 <br /> Assumptions: <br /> • Project description,and design information such as earthwork area pavement area quantities will be <br /> provided to Perteet by the City. <br /> • Site plans and other design drawings for permitting use will be prepared by others.Perteet will not <br /> prepare design drawings under this scope unless scoped additionally as a supplemental effort and fee. <br /> • Special studies(e.g.drainage report,wetland reports,geotechnical reports or any other required studies) <br /> will be provided by others if necessary.Perteet will not prepare special studies under this scope unless <br /> scoped additionally as a supplemental effort and fee. <br /> • Any permit fees will be paid by others. <br /> • No permit appeals assumed. <br /> • No variances,special use permits,or conditional use permits are assumed. <br /> Schedule: <br /> • The schedule for the preparation of the SEPA checklist, Land Use Application,JARPA form,and mailing <br /> list is anticipated to take no more than one full work week to produce after clarification is received from <br /> pre-application meeting. <br /> Task 3—Supplemental Directed Services <br /> • Perteet staff efforts for in-scope items of the project are limited to the hours stated in the attached cost <br /> estimate in Exhibit B with a contract total of$6,505.00 for in-scope services.Additional Perteet services <br /> can be provided on a time and expenses basis as a Client directed service to the dollar limitations of the <br /> overall$10,000 contract amount,making$3,495 available for directed services. <br /> 2 <br /> File location: Y:\Contract Administration\Contracts\Everett\20210234_Silver Lake Trail SEPA_10-6-2021\Everett Silver Lake Trail SEPA Scope of <br /> Services_September 2021.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.