My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10121 EVERGREEN WAY PIZZA HUT 2021-11-02
>
Address Records
>
EVERGREEN WAY
>
10121
>
PIZZA HUT
>
10121 EVERGREEN WAY PIZZA HUT 2021-11-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 4:21:42 PM
Creation date
11/2/2021 4:15:59 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10121
Tenant Name
PIZZA HUT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bruce S. MacVeigh, P.E. <br /> Civil Engineer/Small Site Geotechnical G E N E <br /> 14245 59th Ave. S. D <br /> Tukwila, WA 98168 <br /> Cell Ph: 206-571-8794 OCT 14 2019 <br /> October 11, 2019 r CITY OF EVERETT <br /> Permit Services <br /> City of Everett <br /> Attn: James Bronder, P.E./S.E. <br /> Subject: Response Letter- Roof-Mounted Unit and Hood Evaluation, Pizza <br /> Hut, 10121 Evergreen Way, Suite 23, Everett, WA 98204 <br /> Dear Mr. Bronder: <br /> The following information is provided per the review letters dated October <br /> 1, 2019 and October 3, 2019. The discussion generally follows the order <br /> of comments in the letters, with some supplemental information. Thank <br /> you for your thoughtful guidance and review. <br /> 1. A separate internal structure plan sheet has been prepared for <br /> inclusion in the project plan set. Many details have been added. The <br /> evaluation and calculation sets are provided as a separate document. <br /> 2. The major cross-beam has been formally evaluated for the two HVAC <br /> units, with all roof-mounted units included in the evaluation. The existing <br /> beam is adequate for the combined loading without added support or <br /> alteration. The evaluation calculations have been added to the calculation <br /> set in their own new section. <br /> 3. Formal calculations have been prepared for the post footing pads for <br /> the new truss-supporting transverse beams. Specific details for their <br /> installation under the tenant space wall and in the interior of the tenant <br /> space have been prepared and are on the added plan sheet. <br /> 4. Details of truss blocking over the new transverse support beams have <br /> been prepared and are on the added plan sheet. <br /> 5. A more clarified and detailed beam installation layout drawing has been <br /> prepared and is on the added plan sheet. <br /> 6. Numerous connection clip/bracket/anchor base call-outs have been <br /> added to the drawing. Addition guidance has been added to clarify work <br /> needed by the contractor. <br /> dr-ir /7Z: <br /> Bruce S. MacVeigh, P.E. <br /> Civil Engineer- #18657 robinsoneverettpizzahutresp02/1962 <br />
The URL can be used to link to this page
Your browser does not support the video tag.