Laserfiche WebLink
b) Adequate sewage disposal to City Standards; <br />Finding: There is an existing sewer main located within <br />Melrose Avenue and llenwood Drive. A sewer side service <br />must be extended to each lot. <br />Conclusion: Adequate sewer disposal can be provided to <br />City standards with a side service to each lot. <br />c) Appropriate surface water management to City <br />Standards, - <br />Finding., The site is in the Pigeon Creek #2 Drainage <br />Basin, There is no impact to drainage system on this site <br />Conclusion: Appropriate surface water management can <br />be provided, <br />d) Adequate fire protection and hydrants to City <br />Standards, <br />Finding: A fire hydrant is located 306 feet south of the <br />SW corner of proposed Lot 2, <br />Conclusion: A fire hydrant is not required per City <br />standards <br />e) Appropriate access designed to meet City Standards <br />for anticipated uses within the project, <br />Finding: The access for all lots shall be off of the <br />existing driveway and off existing street frontage. <br />Conclusion: The short subdivision access must be from <br />the existing driveway and off of existing public streets <br />f) Provisions for a// appropriate deeds, dedications, and <br />a// other easements, and <br />Finding: This project will not require a dedication of <br />right-of-way for street purposes <br />Conclusion: The project is designed to meet City <br />Standards <br />g) Provisions made for access to and maintenance of a// <br />common facilities. <br />City of Everett 4 i <br />3200 Cedar Street, ® Everett, WA 08201- (425) 257-7283 o Fax (425) 257-8857 <br />