Laserfiche WebLink
Element 8: Stabilize Channels and Outlets (2.1.8) <br />Provide stabilization, including armoring material, adequate to prevent erosion of outlets, <br />adjacent stream banks, slopes, and downstream reaches, will be installed at the outlets of all <br />conveyance systems. <br />List and describe BMPs: C200 Interceptor Swale <br />Installation Schedules: Install prior to beginning earthwork activities; however, if all <br />work can be completed during dry weather and permission <br />is granted by the city of Everett inspector prior <br />commencement of work, the interceptor ditches may be <br />omitted. <br />Inspection and Maintenance plan: Inspect weekly and after every rainfall. Repair erosion of <br />deformations to the swale that allow surface water out of <br />the intended path of the swale. <br />Responsible Staff: Contractor's CESCL - TBD <br />