Laserfiche WebLink
Table 11-4.2.1 Runoff Conveyance and Treatment BMPs by SWPPP <br />Element (continued) <br />Ele- <br />Element <br />Element <br />Ele- <br />Ele- <br />ment <br />#4 <br />Ele- <br />#8 Stab- <br />ment <br />Element <br />#3 <br />Install <br />ment <br />ment <br />ilize <br />Element <br />#10 <br />#13 Protect <br />BMP or Ele- <br />7 Pro <br />#9 Con - <br />ment Name <br />Con- <br />Sed- <br />#6 Pro- <br />tact <br />Chan- <br />_Control <br />COI POI <br />Low Impact <br />trot <br />iment <br />tact <br />nets <br />De- - <br />Devel- <br />Drain <br />lutants <br />Flow <br />Con- <br />Slopes <br />and Out <br />Water- <br />opment <br />Rates <br />I trols <br />Inletslets <br />ing <br />for High pH <br />Water <br />tp 412) <br />BMP C2OO: Interceptor Dike and Swale <br />Purpose <br />Provide a ridge of compacted soil, or a ridge with an upslope swale, at the top or base of <br />a disturbed slope or along the perimeter of a disturbed construction area to convey storm - <br />water. Use the dike and/or swale to intercept the runoff from unprotected areas and direct <br />it to areas where erosion can be controlled. This can prevent storm runoff from entering <br />the work area or sediment -laden runoff from leaving the construction site. <br />Conditions of Use <br />Where the runoff from an exposed site or disturbed slope must be conveyed to an <br />erosion control facility which can safely convey the stormwater. <br />. Locate upslope of a construction site to prevent runoff from entering disturbed area. <br />. When placed horizontally across a disturbed slope, it reduces the amount and velo- <br />city of runoff flowing down the slope. <br />Locate downslope to collect runoff from a disturbed area and direct water to a sed- <br />iment basin. <br />Design and Installation Specifications <br />. Dike and/or swale and channel must be stabilized with temporary or permanent <br />vegetation or other channel protection during construction. <br />. Channel requires a positive grade for drainage; steeper grades require channel <br />protection and check dams. <br />. Review construction for areas where overtopping may occur. <br />. Can be used at top of new fill before vegetation is established. <br />2014 Stormwater Management Manual for Western Washington <br />Volume 11 - Chapter 4 - Page 331 <br />