My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 E MARINE VIEW DR 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
17
>
17 E MARINE VIEW DR 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 3:08:39 PM
Creation date
11/9/2021 2:21:48 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
17
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. May be used as a permanent diversion channel to cant' the runoff. <br />. Sub -basin tributary area should be one acre or less. <br />. Design capacity for the peak volumetric flow rate calculated using a 10-minute time <br />step from a 10-year, 24-hour storm, assuming a Type 1A rainfall distribution, for <br />temporary facilities. Alternatively, use 1.6 times the 1 0-year, 1 -hour flow indicated <br />by an approved continuous runoff model. For facilities that will also serve on a per- <br />manent basis, consult the local government's drainage requirements. <br />Interceptor dikes shall meet the following criteria: <br />. Top Width: 2 feet minimum. <br />. Height: 1.5 feet minimum on berm. <br />. Side Slope: 2H:lV orflatter. <br />. Grade: Depends on topography, however, dike system minimum is 0.5%, and max- <br />imum is 1 %. <br />. Compaction: Minimum of 90 percent ASTM D698 standard proctor. <br />. Horizontal Spacing of Interceptor Dikes: <br />Average Slope <br />Slope Percent <br />Flowpath Length <br />20H:l V or less <br />3-5% <br />300 feet <br />(10 to 20)H:lV <br />5-10% <br />200 feet <br />(4 to 10)H:1V <br />10-25% <br />100 feet <br />(2 to 4)H:1 V <br />25-50% <br />150 feet <br />• Stabilization: depends on velocity and reach <br />. Slopes <5%: Seed and mulch applied within 5 days of dike construction (see BMP <br />C121: Mulching (p.284)). <br />. Slopes 5 - 40%: Dependent on runoff velocities and dike materials. Stabilization <br />should be done immediately using either sod or riprap or other measures to avoid <br />erosion. <br />. The upslope side of the dike shall provide positive drainage to the dike outlet. No <br />erosion shall occur at the outlet. Provide energy dissipation measures as neces- <br />sary. Sediment -laden runoff must be released through a sediment trapping facility. <br />. Minimize construction traffic over temporary dikes. Use temporary cross culverts for <br />channel crossing. <br />Interceptor swales shall meet the following criteria: <br />. Bottom Width: 2 feet minimum; the cross-section bottom shall be level. <br />Depth: 1-foot minimum. <br />2014 Stormwater Management Manual for Westem Washington <br />Volume 11 - Chapter 4 - Page 332 <br />
The URL can be used to link to this page
Your browser does not support the video tag.