My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1909 MONROE AVE 2022-02-23
>
Address Records
>
MONROE AVE
>
1909
>
1909 MONROE AVE 2022-02-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 3:27:10 PM
Creation date
11/9/2021 2:34:37 PM
Metadata
Fields
Template:
Address Document
Street Name
MONROE AVE
Street Number
1909
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/2/2021 <br />1:25:46PM <br />City of Everett <br />INSPECTION ACTIVITY REPORT <br />Page 1 <br />Permit No. C1710-002 <br />Applied <br />10/6/2017 <br />Approved <br />12/13/2017 <br />Issued <br />12/14/2017 <br />Parent Permit No. <br />PW 1710-027 <br />Site Address 1909 MONROE AVE <br />Applicant Lot <br />Owner GARZA RUDOLFO R Block <br />Contractor OWNER Tract <br />Description NEW DADU W/ATTACHED GARAGE <br />Notes <br />Scheduled <br />Completed <br />TvDe <br />Inspector <br />Result <br />Remarks <br />Inspector's Comments <br />1/18/2018 <br />1/18/2018 <br />BLDG <br />DWF <br />APPROVAL <br />Need to install UFER ground <br />02-FOOTING/SETB <br />Contractor - verified p setbacks <br />-Installed UFER ground <br />Approved as noted <br />Need wire ties every 12" on UFER for <br />positive ground <br />1/18/2018 <br />1/18/2018 <br />BLDG 04-UFER <br />DWF <br />APPROVAL <br />Need to install UFER ground <br />GROUND <br />Contractor - verified p setbacks <br />-Installed UFER ground <br />Approved as noted <br />Need wire ties every 12" on UFER for <br />positive ground <br />1/25/2018 <br />1/25/2018 <br />BLDG <br />DWF <br />APPROVAL <br />OK for concrete <br />03-FOUNDATION <br />5/15/2018 <br />5/15/2018 <br />BLDG <br />DWF <br />APPROVAL <br />05-UNDERFLOOR <br />7/12/2018 <br />7/12/2018 <br />BLDG <br />DWF <br />CORRECTION <br />10:59am <br />07-EXTERIOR <br />Need approved set of plans for shear nailing <br />inspection <br />7/13/2018 <br />7/13/2018 <br />BLDG <br />DWF <br />PARTIAL APPR <br />No trusstrafters at <br />07-EXTERIOR <br />this time <br />8/30/2018 <br />8/30/2018 <br />BLDG <br />DWF <br />APPROVAL <br />Shear nailing not <br />07-EXTERIOR <br />required (roof). <br />2/26/2019 <br />2/26/2019 <br />PERMIT <br />CRB <br />APPROVAL <br />EXTENSION <br />5/29/2019 <br />5/29/2019 <br />PLUMB <br />DXW <br />CORRECTION <br />AM Inspection requested <br />03-ROUGH IN <br />425-309-1020 <br />(5/29/2019 2:01 PM DXW) <br />test waste, vents, water pipe. <br />fire rated laundry box req. in rated wall <br />between garage and living space <br />6/10/2019 <br />6/10/2019 <br />PLUMB <br />RRS <br />PARTIAL APPR <br />R/I <br />AM Inspection requested <br />03-ROUGH IN <br />approved -corrections <br />425-309-1020 Rudy <br />made from 5/29 <br />(6/10/2019 12:07 PM RRS) <br />R/I approved -corrections made from 5/29 <br />R/I inspection <br />10/4/2019 <br />10/4/2019 <br />BLDG <br />DWF <br />NOT READY <br />(10/4/2019 10:22 AM DWF) <br />08-FRAMING <br />Need plumbing and mechanical RI sign off <br />before Framing inspection. <br />10/7/2019 <br />10/7/2019 <br />BLDG <br />DWF <br />NOT READY <br />(10/7/2019 12:34 PM DWF) <br />08-FRAMING <br />Need plumbing RI sign offbefore framing <br />inspection. <br />10/10/2019 <br />10/10/2019 <br />MECH 04-ROUGH <br />DXW <br />CORRECTION <br />Bathroom fan <br />IN <br />(10/10/2019 12:46 PM DXW) <br />complete line set and condensate for head <br />unit. <br />24 hr. timer req. on whole house fan. <br />as noted will check dryer and R/H exh. at <br />final <br />INSP12 Cf"fi,YST M S <br />
The URL can be used to link to this page
Your browser does not support the video tag.