Laserfiche WebLink
11/2/2021 <br />City of Everett <br />1:25:46PM <br />INSPECTION ACTIVITY REPORT <br />10/29/2019 10/29/2019 <br />BLDG <br />DWF NOT READY <br />08-FRAMING <br />11/1/2019 11/1/2019 <br />BLDG <br />DWF APPROVAL <br />08-FRAMING <br />11/1/2019 11/l/2019 <br />MECH 04-ROUGH <br />DXW APPROVAL <br />IN <br />11/12/2019 11/12/2019 BLDG KMK <br />11-INSULATION <br />12/2/2019 12/2/2019 BLDG DWF <br />09-DRYWALL <br />12/31/2019 12/31/2019 BLDG DWF <br />09-DRYWALL <br />10/27/2020 <br />10/27/2020 <br />PERMIT <br />KLC <br />EXTENSION <br />4/1/2021 <br />4/1/2021 <br />PLUMB 06-FINAL <br />TAHU <br />4/13/2021 <br />4/13/2021 <br />PERMIT <br />KLC <br />EXTENSION <br />4/21/2021 <br />4/21/2021 <br />BLDG 16-FINAL <br />KMK <br />4/23/2021 <br />4/23/2021 <br />BLDG 16-FINAL <br />KMK <br />11/2/2021 <br />11/2/2021 <br />CERTIFICATE OF <br />KLC <br />OCCUPANCY <br />APPROVAL <br />APPROVAL <br />APPROVAL as noted <br />EXTENSION A <br />COVID <br />EXTENSION <br />APPROVAL <br />EXTENSION A <br />COVID <br />EXTENSION <br />NOT READY <br />schedule public <br />works final <br />APPRVD-PERK <br />Correction <br />completed <br />APPROVAL <br />Attached <br />Page 2� <br />(10/29/2019 8:46 AM DWF) <br />Need Mechanical and Plumbing RI sign off <br />before Framing inspection. <br />Rudy:425-232-7039 <br />Rudy:425-232-7039 <br />(I I/l/2019 12:32 PM DXW) <br />as noted insp. will look at 24 hr. timer at <br />final. <br />Rudy:425-232-7039 <br />Rudy:425-232-7039 <br />(12/31/2019 9:45 AM DWF) <br />Need to fire tape garage walls and ceiling <br />for a building final. <br />(4/21/2021 2:36 PM KMK) <br />Schedule public works final <br />INSP12 CR S (.. TEA AS <br />