Laserfiche WebLink
0 <br />August 14, 2019 <br />Jeff Heilman <br />Development Technician <br />City of Everett Public Works Department <br />3200 Cedar Street, Everett WA 98201 <br />RE: response letter to building permit review letter <br />Dear Mr. Heilman, <br />As requested, please see our responses indicating how the corrections were resolved: <br />1. The dimensions on the foundation plan have been corrected to match the architectural <br />pages on A2.0 <br />2. Correction made. Please note the demolition plan as existing structure. <br />3. Text added to Foundation Plan: "Typical Detail A 2' long #4 rebar, drill with 5/8 drill into <br />existing concrete..." <br />4. Text added to Foundation Plan "slope concrete slab towards front" <br />5. Text added to Foundation Plan and S5 <br />6. Text added to Foundation Plan as suggested <br />7. Text added to Foundation Plan as suggested <br />8. Text added to Foundation Plan as suggested <br />9. All landings will be at same elevation as floor or sub floor. See S5 Cross Section B-B , <br />west side (front porch) <br />10. Text added to Foundation Plan as suggested <br />11. See S2 and S5 Cross Section B-B. Please also note that the stair landing platform is to be <br />framed onto the new west exterior wall and the current existing exterior wall <br />12. See S2 and S5 <br />13. a-i. See S1-S6 <br />14. See revisions on A2.0 and A2.1 <br />15. See S2 and S5. Please also note attached Truss calculations as no interior wall shall be a <br />weight bearing ball <br />16. See revisions on A2.0 and A2.1 <br />17. See S1-S6 <br />Thank you for your help in obtaining our building permit. Feel free to email or call anytime with <br />your questions or requests for clarification. <br />Sincerely, zo(, - /o RAUG <br />, `. FE <br />IjCalvin Vander Veen, Owner/General Contractor 15 2019 DD <br />Vander Veen Construction <br />CITY OF EVERETT <br />Permit Services <br />