Laserfiche WebLink
0 <br />Task 2: Select where the project will discharge its stormwater <br />❑ An existing piped conveyance system <br />❑ Outlet protection such as rip -rap pad (less than 0.3 CFS) <br />❑ Dispersion trench or other dispersion facility (0.3 to 0.75 CFS) <br />❑ Piped conveyance to appropriate discharge location with easement if required <br />(greater than or equal to 0.75 CFS) <br />® Other: The project will discharge stormwater collected from the new roof area to the existing asphalt pavemet <br />via downspouts. The runoff will then flow towards the existing catch basins at the south end of the <br />asphalt as in the existing condition. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 <br />16 <br />