My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9600 SHARON DR EXPLORER MIDDLE SCHOOL 2022-03-11
>
Address Records
>
SHARON DR
>
9600
>
EXPLORER MIDDLE SCHOOL
>
9600 SHARON DR EXPLORER MIDDLE SCHOOL 2022-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 10:53:08 AM
Creation date
11/9/2021 3:50:14 PM
Metadata
Fields
Template:
Address Document
Street Name
SHARON DR
Street Number
9600
Tenant Name
EXPLORER MIDDLE SCHOOL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 <br />MR #5: On -Site Stormwater Management <br />All projects meeting the thresholds for this Small Project Stormwater Report shall employ on -site <br />stormwater management BMPs to infiltrate, disperse and retain stormwater runoff on -site to the extent <br />feasible without causing flooding or erosion impacts on -site or downstream. <br />Task 1: Determine whether infiltration has been pre -determined to be infeasible <br />for any portion of your project site. <br />■ Review the infiltration infeasibility mapping tool available on "Map Everett" <br />everettwa.gov/mapeverett. <br />■ On the mapping tool, select "Geotechnical/Infiltration Infeasibility Area" and the <br />applicable "Property" layers from the Layer List. <br />■ Zoom into your project site and print the resulting map to show the project site <br />boundaries and the infiltration infeasibility mapping results. <br />■ Areas mapped as red have been pre -determined to be infeasible for infiltration. <br />■ Areas mapped as green are potentially feasible for infiltration and must be <br />assessed further for infiltration feasibility, as discussed further below. <br />■ Attach a printed copy of the map clearly showing your project site boundary and the <br />infiltration infeasibility mapping results. <br />Task 2: Determine whether the project is flow control exempt. <br />How do I know if my project is flow control exempt? <br />Your project is flow control exempt if 1) your project discharges directly to the Puget Sound <br />or Snohomish River, or 2) your project discharges to a stormwater system entirely man-made <br />from the site to either of those water bodies, although subject to the following: the project <br />will reduce discharge rates to an existing stream or wetland, or the conveyance system has <br />adequate capacity to accommodate increased flows without flooding or causing erosion. <br />See Ecology SWMMWW Volume 1 for more information on flow control exempt criteria. <br />0 Select one of the boxes below: <br />® Project is not flow control exempt and List #1 will be used to satisfy MR #5 (Go to page 18). <br />❑ Project is flow control exempt and List #3 will be used to satisfy MR #5 (Go to page 19). <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.