Laserfiche WebLink
Task 3: List #1 approach to MR #5 compliance <br />You are required to use the first applicable BMP that is considered feasible in each <br />0 category (lawn, landscape, and hard surfaces) below. Mark whether the BMP is feasible or <br />infeasible. If you selected infeasible, cite the reasons for infeasibility (see Worksheet 2) <br />and or a professional, site specific reference to supporting documentation (such as a <br />geotechnical report). <br />List #1: On -Site Stormwater Management BMPs for MR #1-5 Projects <br />Feasible <br />Infeasible <br />If infeasible provide justification <br />BMP T5.13: <br />Post -Construction Soil Quality <br />Whil <br />- no disturbances to existing landscap <br />and Depth <br />—1 new <br />andscaped areas are proposed as part <br />pro.icct <br />any landscaped areas disturbed as a <br />Feasible <br />Infeasible <br />If infeasible provide justification <br />BMP T5.10A: <br />Downspout Full Infiltration* <br />X. <br />`Solli retort retgiuired fqr this BMP <br />or <br />imr <br />a ion o orestc or native ve <br />ervious area cannot he acheived. <br />BMP 5.30: <br />Full Dispersion <br />Thc <br />re is not at least 3 meet or more of pen <br />BMP T5.14A: <br />Rain Gardens* <br />_ <br />*Soils report required for this BMP <br />or <br />The minimum vertical separation of I <br />foot to the hardpan (Glacial Till) wou <br />BMPT7.30: <br />Bioretention Cells, Swales, <br />al <br />not be achievedbelowbioretention th <br />and Planter Boxes <br />would serve a drainage area less than <br />the above thresholds. <br />BMP T5.1013: <br />Downspout Dispersion <br />The required vegetated flowpath <br />downstream of tie downspouts is <br />Systems <br />not feasible. <br />BMP T5.10C: <br />Perforated Stub -out <br />The only location available for the <br />Connections <br />X <br />perforated stub -out connectionis <br />under impervious surface <br />No other hard surfaces proposed. <br />Feasible <br />Infeasible <br />If infeasible provide justification <br />BMP T.530: <br />Full Dispersion <br />—1 <br />BMP T5.15: <br />Permeable Pavements* <br />—.I <br />*Soils report required for this BMP <br />or <br />BMP T5.14A: <br />Rain Gardens* <br />F_ <br />I <br />or <br />BMPT7.30: <br />Bioretention Cells, Swales, <br />and Planter Boxes <br />BMP T5.12: <br />Sheet Flow Dispersion <br />F_ <br />—1 <br />or <br />BMP T5.11: <br />Concentrated Flow Dispersion <br />I <br />L <br />* If you selected BMP T5.10A Downspout Full Infiltration submit 1 and 3 below. <br />* If you selected BMPT5.15 Permeable Pavement or T5.14A Rain Gardens in List#1, on -site soils information for sizing <br />or infeasibility determination is required from 1 through 4 below. <br />Submit the following information to Permit Services with this report: <br />1) A USDA Custom Soil Report from websoilsurvey.sc.egov.usda.gov <br />2) Small-scale Pilot Infiltration Tests (PIT) per SWMMWW specifications <br />3) USDA Soil Type(s)= <br />4) Measured Infiltration Rate = in/hr (from PIT) <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 18 <br />d areas or <br />it the <br />result of the <br />nuance with <br />etation area <br />ieable soil fro <br />