Laserfiche WebLink
0 0 <br />Andy Yim <br />Subject: <br />RE: parking at Everett Station <br />From: Michael Brick [mailto:MBrick@everettwa.gov] <br />Sent: Tuesday, May 15, 2018 12:48 PM <br />To: Vincent Bruscas <VBruscas@eve rettwa.gov>; Tom Hingson <THingson@everettwa.gov>; Darrell Smith <br /><darrell.smith@perteet.com>; Brian Caferro <brian.caferro@perteet.com> <br />Cc: Tony Lee <TLee@everettwa.gov> <br />Subject: RE: parking at Everett Station <br />Vince, <br />Thanks for providing the parking totals so quickly. Looking at the total supply (with or without the Sound Transit lot) the <br />existing accessible parking supply exceeds requirements and will continue to do so after the project we discussed today, <br />even if no new accessible spaces are added. <br />Michael G. Brick, P.E. <br />Associate Engineer <br />Public Works / Traffic Engineering <br />P:425.257.7790 / C:425.328.0641 <br />E: mbrick@everettwa.gov <br />3200 Cedar St, Everett, WA 98201 <br />www.everettwa.gov <br />1:171 <br />NOTICE: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure <br />pursuant to the Public Records Act. <br />From: Vincent Bruscas <br />Sent: Tuesday, May 15, 2018 12:31 PM <br />To: Tom Hingson; Darrell Smith; Brian Caferro; Michael Brick <br />Subject: parking at Everett Station <br />Hi Mike: <br />Existing parking lot counts at Everett Station <br />LOT <br />TOTAL PARKING <br />ADA PARKING <br />NORTH <br />103 <br />7 <br />PACIFIC OVERPASS <br />16 <br />NW PERMIT <br />51 <br />3 <br />WEST <br />240 <br />SOUTH <br />237 <br />10 <br />EAST LOT (SOUND TRANSIT)* <br />432 <br />9 <br />TOTAL without ST <br />631 <br />20 <br />TOTAL with ST <br />1063 <br />29 <br />*East lot is Sound Transit property not sure if need to include. <br />a)2- <br />