Laserfiche WebLink
;%PERTEET <br />MEMORANDUM <br />2707 Colby Avenue, Suite 900, Everett, WA 98201 1 P 425.252.7700 <br />To: City of Everett <br />From: Jason Walker, PLA, PWS, Environmental Manager, Perteet <br />Date: June 1, 2018 <br />Re: Everett Station Park and Ride Expansion ADA Parking Stall Compliance <br />For the purpose of City review of ADA parking spaces, The Everett Station Park and Ride Expansion proposes <br />adding an additional 90 parking stalls in the project site, bringing the total number of stalls to 721 for the entre <br />(off site) transit facility and without the Sound Transit lot included, and 1,153 with the Sound Transit lot included. <br />Per PROWAG 2011 Section F208.2 this would require 15 or 22 total (Standard + Van) ADA accessible stalls <br />respectively for the entire transit facility. <br />No new ADA stalls will be provided in the Everett Station Park and Ride Expansion site since they are not <br />necessary and this expanded parking lot does not occur directly adjacent to any transit facilities to make ADA <br />stalls and accessibility functional in this area for this expansion. <br />As documented in the attached emails, the total existing accessible (ADA) parking supply currently exceeds ADA <br />parking requirements and will continue to meet and exceed facility -wide ADA parking requirements after the <br />expansion project is completed. Existing ADA stalls in the overall facility were also verified to be van accessible by <br />ET staff. <br />Emails attached. <br />File location XAEverett, City of\Projects\20170146 - Evt Station P&R Expansion\Environmental\PW Permit Docs\Everett Station Expansion - ADA <br />Parking Memorandum.docx <br />9/ <br />