My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10105 1ST DR SE 2021-12-14
>
Address Records
>
1ST DR SE
>
10105
>
10105 1ST DR SE 2021-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 2:39:43 PM
Creation date
11/10/2021 9:32:01 AM
Metadata
Fields
Template:
Address Document
Street Name
1ST DR SE
Street Number
10105
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AE CONSTRUCTION SFR <br />Element # 9: Control Pollutants <br />All pollutants from construction vehicles will be contained and disposed of in the <br />approved manner consistent with state environmental policies. Any vehicle <br />maintenance will be performed by authorized mechanics using drip pans and <br />waste containment vessels. All pollutants will be disposed offsite at approved <br />facilities. <br />Element # 10: Control De -Watering <br />De -watering of the site is not expected. If dewatering of the site is needed, all <br />groundwater removed shall be retained and recharged into the ground after de - <br />watering has been finalized. <br />Element # 11: Maintain BMPs <br />All Temporary Erosion and Sedimentation Control (TESC) devices and <br />equipment will be inspected and maintained on a weekly basis if not sooner, <br />based on storm events contributing to runoff. When construction is complete and <br />the site is stabilized, any existing sediment will be removed and stabilized onsite. <br />Element # 12: Manage the Project <br />A general construction manager will manage the project for or by the owners. The <br />construction manager shall maintain all of the above items in order to minimize <br />sediment transport and turbid water leaving the site. His job will entail continual <br />observation of the grading operations to ensure minimal effects to adjacent <br />properties and offsite waterways. <br />Element # 13: Protect On -Site Stormwater Management BMPs <br />Stormwater management mainly consists of dispersion and soil amendment <br />BMPs. Dispersion flow paths and soil amendment areas will be protected from <br />siltation and compaction when feasible. <br />2. PROJECT DESCRIPTION <br />The proposed project consists entirely of clearing/grading for the construction of a <br />new single-family residence with associated driveway, and drainage improvements. <br />The existing house and driveway will remain on the west half of the property. <br />Drainage management for new roof, areas is to consist primarily of roof drain <br />dispersion per BMP T5.1013. Drainage management for new driveway areas consist <br />of concentrated flow dispersion per BMP T5.11. Disturbed vegetated areas will be <br />amended lawn per BMP T5.13. Total new impervious area proposed for the project <br />total 4,945 sf, entirely located within the boundary lines of the site. The project is to <br />be designed to the 2014 DOE manual and City of Everett code section 14.28. <br />JOB NO: 19-1821-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.