My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10105 1ST DR SE 2021-12-14
>
Address Records
>
1ST DR SE
>
10105
>
10105 1ST DR SE 2021-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 2:39:43 PM
Creation date
11/10/2021 9:32:01 AM
Metadata
Fields
Template:
Address Document
Street Name
1ST DR SE
Street Number
10105
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AE CONSTRUCTION SFR <br />8. CONSTRUCTION PHASING <br />Construction Sequence <br />1. Pre -construction meeting. <br />2. Flag or fence clearing limits. <br />3. Install perimeter protection (silt fence, brush barrier, etc.). <br />4. Construct surface water controls (interceptor dikes, pipe slope drains, etc.) <br />simultaneously with clearing and grading for project development. <br />5. Maintain erosion control measures in accordance with Snohomish county <br />standards and manufacturer's recommendations. <br />6. Cover all areas that will be unworked for more than seven days during the dry <br />season or two days during the wet season with straw, wood fiber mulch, <br />compost, plastic sheeting or equivalent. <br />7. Stabilize all areas that reach final grade within seven days. <br />8. Seed or sod any areas to remain unworked for more than 30 days. <br />9. Upon completion of the project, all disturbed areas must be stabilized and best <br />management practices removed if appropriate. <br />10. All temporary erosion and sediment control measures shall be removed within <br />30 days after final site stabilization is achieved or after the temporary BMP's <br />are no longer needed. Trapped sediment shall be removed or stabilized on site. <br />Disturbed soil areas resulting from removal shall be permanently stabilized. <br />PHASE CONSTRUCTION ACTIVITY <br />No planned phased construction is expected. <br />9. CONSTRUCTION SCHEDULE <br />BMP implementation schedule listed below is keyed to proposed phases of the <br />construction project, and reflects differences in BMP installations and inspections that <br />relate to wet and dry season construction. As such, the dry season is considered to be <br />from May 1 to September 30 and the wet season is considered to be from October 1 <br />to April 30. <br />■ Estimate of Construction start date: <br />■ Estimate of Construction finish date: <br />■ Mobilize equipment on site: <br />■ Clear Vegetation From Site <br />■ Begin Building Construction <br />■ Complete Final Site Stabilization <br />JOB NO: 19-1821-A <br />05 / 01 / 2020 <br />07 / 30 / 2020 <br />05 / 01 / 2020 <br />05 / 03 / 2020 <br />05 / 05 / 2020 <br />07/30/2020 <br />