My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10105 1ST DR SE 2021-12-14
>
Address Records
>
1ST DR SE
>
10105
>
10105 1ST DR SE 2021-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 2:39:43 PM
Creation date
11/10/2021 9:32:01 AM
Metadata
Fields
Template:
Address Document
Street Name
1ST DR SE
Street Number
10105
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Verifying Soil Quality and Depth — SECTION SIX <br />Model FIELD VERIFICATION FORM for BMP T5.13 <br />(available as MS Word file at www.SoilsforSalmon. orp) <br />PROJECT INFORMATION Page # _ of _ pages <br />Complete all information on page 1, only site address and permit number on additional pages. <br />Site Address: <br />Permit Type: Permit Number: <br />Permit Holder: Phone: <br />Mailing Address: <br />Customer Representative At Inspection: Phone: <br />Plan Prepared BY: <br />VISIT RECORD <br />Date: <br />Inspector: <br />Items Approved: _ Fencing off undisturbed areas _ Soil preparation <br />Mulch Other: <br />Date: <br />Inspector: <br />Items Approved: _ Fencing off undisturbed areas _ Soil preparation <br />Mulch Other <br />Date: <br />Inspector: <br />Items Approved: _ Fencing off undisturbed areas _ Soil preparation <br />Mulch Other: <br />DELIVERY TICKETS FOR AMENDMENT, TOPSOIL & MULCH. <br />(Check if tickets match Soil Management Plan (SMP). Total volumes for all areas should be on page I of the SMP). <br />❑ <br />Product #1: <br />Comments: <br />❑ <br />Test Results: <br />_ % organic matter <br />_C:N ratio <25:1 _ "stable" (Y/N) <br />❑ <br />Quantity: <br />cu. yds. <br />(except mulch, or <35:1 for native plants <br />❑ Product #2: <br />❑ <br />Test Results: <br />_ % organic matter <br />_C:N ratio <25:1 "stable" (Y/N) <br />ElQuantity: <br />cu. yds. <br />(except mulch, or <35:1 for nativeplants) <br />❑ Product #3• <br />❑ <br />Test Results: <br />_ % organic matter <br />_C:N ratio <25:1 "stable" (Y/N) <br />❑ <br />Quantity: <br />cu. yds. <br />(except mulch, or <35:1 for nativeplants) <br />AREA # (refer to Areas mapped on Site Plan and described on Soil Management Plan) <br />PLANTING TYPE <br />Test Holes <br />Rod Test <br />_ Undisturbed vegetation <br />Number Test Holes Required: (minimum 1 hole/acre) <br />Number Rod Tests Required:_ <br />_ Turf <br />Soil Amended 8 Inches Deep? Y / N <br />(minimum 10 tests/acre) <br />_ Planting Beds <br />Amendment Matches Soil Mgmt. Plan? Y / N <br />_ Other: <br />❑ Topsoil Product ? <br />Rod penetrates 12 inches <br />❑ Amendment Visible ? <br />deep in all areas? Y / N <br />Square foota e: <br />Subsoil Loose/Scarified 12 Inches Deep? Y / N <br />(If Planting Bed Mulch is Required After Planting) <br />Comments: <br />Mulch Product: <br />Mulch two inches deep? Y / N <br />AREA # <br />PLANTING TYPE <br />Test Holes <br />Rod Test <br />_ Undisturbed vegetation <br />Number Test Holes Required:_ (minimum 1 hole/acre) <br />Number Rod Tests Required:_ <br />Turf <br />Soil Amended 8 Inches Deep? Y / N <br />(minimum 10 tests/acre) <br />Planting Beds <br />Amendment Matches Soil Mgmt. Plan? Y / N <br />_ Other: <br />❑ Topsoil Product ? <br />Rod penetrates 12 inches <br />❑ Amendment Visible ? <br />deep in all areas? Y / N <br />Square footage: <br />Subsoil Loose/Scarified 12 Inches Deep? Y / N <br />(If Planting Bed, Mulch is Required After Planting) <br />Comments: <br />Mulch Product: <br />Mulch two inches deep? Y / N <br />Add additional sheets for additional Areas <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.