Laserfiche WebLink
4. SWPPP NARRATIVE <br />The intent of this section is to provide the information necessary to support the <br />engineering plans in order. to implement a design that will; reduce, eliminate or prevent the <br />discharge of stormwater pollutants,. meet or exceed the water quality and sediment <br />management standards , for the City and State, and. prevent adverse impacts to. the <br />receiving waters for this project. Note; this narrative is intended to support the SWPPP <br />that is included with the Drainage Plans also apart of this submittal package to,the City. <br />A. <br />Area proposed to be cleared/worked: 0.15 acres <br />Average slope for the site: 4% (Area of Disturbance Only) <br />Erosion Hazard of Soil Low <br />Critical Areas downslope No <br />Site is upstream of an ESA Stream No <br />Based on the above information and the fact that the.area of the site to be disturbed is flat <br />and construction site runoff will pass through silt fencing. or other; perimeter filtration <br />features prior to leaving the site, and that if site conditions warrant, additional BMP's can <br />be, implemented as corrective measures the Risk Category for this site is Low Risk. <br />B. SWPPP MINIMUM ELEMENTS <br />1: Preserve Vegetation and Mark Clearing Limits <br />The first step in the construction process is for the contractor to flag or fence the, limits of <br />clearing/disturbance (BMP C103),prior to any other, construction activity. The engineering <br />plans locate and provide the square footages for the areas of grading, clearing, impervious <br />surfaces and un-disturbed areas on the proposed site. The entire- project °parcel '(015 <br />acres) will be cleared or disturbed for this project <br />2: Establish Construction Access <br />The SWPPP calls for the existing gravel _driveway to be used as a` construction entrance, <br />At this time winter work is expected during the wet season. <br />3: Control Flow Rates <br />This,project is below the thresholds requiring flow control for the project. <br />4:. Install Sediment Controls <br />This site SWPPP proposes to use the existing gravel driveway as a construction .entrance <br />(BMP C105), vegetative buffer (BMP C102), silt fencing (BMP C233) if necessary and <br />retention of the existing vegetation (BMP C101) that will provide a vegetated strip between <br />the cleared areas and any property line. The construction of these features should be <br />completed Woreuthe-clearing ;-and grading ,6flhe� site: `Mulch (BMP C121) will also be <br />used on the exposed .soil as necessary to limit erosion. In addition, streets shall be <br />cleaned as needed at the end of each work day or throughout the day if dirt and debris is <br />tracked onto the paved surfaces. <br />Haack 75th SFR 20-0817 <br />September 2020 <br />Revised November2020" Page 6 <br />