My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2325 75TH ST SE 2021-12-27
>
Address Records
>
75TH ST SE
>
2325
>
2325 75TH ST SE 2021-12-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2021 4:05:49 PM
Creation date
11/10/2021 10:52:27 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
2325
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5: Stabilize Soils <br />The "Construction Sequence" calls for the stabilization of soils that. remain unworked for <br />certain lengths of time based on the time of year. Stabilization techniques may include but <br />not limited to mulching (BMP C121), plastic sheeting .(BMP C123) or hydroseeding (BMP <br />C120), notes have been added to the plan regarding protection for the stock pile area if <br />necessary. A.stockpile-:.area. has been identified on the SWPPP and is setback a minimum <br />of 10-feet from any down slope. property line. In addition, during dry periods soil should be <br />covered or wetted (BMP C140) to reduce the production of dust. <br />Protect Slgp6s- <br />All disturbed slopes on site during construction are required `to be protected with mulch <br />(BMP C121) or other means as specified in the construction sequence like surface <br />roughening (BMP C103) No concentrated runoff or significant amounts of sheet flow will <br />be directed to new cut or fill slopes during construction (BMP C206). <br />7: Protect Drain Inlets <br />No drain inlets exist on site. <br />8: Stabilize Channels and Outlets <br />No new channels or outlets are proposed for this site. <br />9: Control Pollutants <br />No outside chemicals are expected to be necessary for the construction of this project. <br />Concrete truck chutes, pumps, internals and hand tools shall be washed out only into <br />formed'areas awaiting installation of concrete or asphalt. Unused concrete remaining in <br />the truck and pump shall be returned to the originating batch plant for recycling.. When no <br />formed areas are available, washwater and leftover product 'shall be contained in a lined <br />container and disposed of in a manner that does not violate waterquality standards. _ All <br />vehicles working on and around the site would need to meet the State requirements for <br />emissions.- A drip pan or other appropriate temporary containment device shall be placed <br />at locations where leaks or spills may 'occur during the fueling or maintenance of <br />machinery. <br />10: Control DeWatering <br />DeWatering is not anticipated for this project. <br />11: Maintain BMPs <br />The' construction supervisor will be responsible for maintaining all BMPs during <br />construction :arid,working with-the--City:.of Everett.to-relocate or add BMPs. as -necessary as <br />site conditions change. <br />12: Manage the Project <br />It will be the responsibility of the Contractor and Developer to manage this project and <br />coordinate with the City Inspector and Engineer. <br />Haack 75th SFR 20-0817 <br />September 2020 <br />Revised November 2020 Page 7. <br />
The URL can be used to link to this page
Your browser does not support the video tag.