My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2325 75TH ST SE 2021-12-27
>
Address Records
>
75TH ST SE
>
2325
>
2325 75TH ST SE 2021-12-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2021 4:05:49 PM
Creation date
11/10/2021 10:52:27 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
2325
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection and Monitoring: <br />Site inspections shall be done by `a. person who is knowledgeable in the principles and <br />practices of erosion and sediment control. The person must have skills to first assess the <br />site :conditions„and-construction .activities that could impact the quality of stormwater, and <br />second assess the effectiveness of erosion and sediment control measures Used to <br />control the quality of stormwater. . discharges. Whenever inspection and/or monitoring <br />reveals that the BMPs identified in the Construction SWPPP are inadequate, due to the <br />isc 'e of or ot-ential to dig9charge a significant amount of any ollutant <br />appropriate BMPs or design changes shall be implemented as soon as possible. <br />Maintaining an Updated Construction SWPPP <br />The construction'SWPPP shall be retained on -site or within reasonable access to the site. <br />The SWPPP shall be modified whenever there is a change in the design, construction, <br />operation, or maintenance at the construction site that has, or could have, a significant <br />effect on the discharge of pollutants to waters of the state. <br />The SWPPP. shall be modified if, during inspections or investigations conducted by the <br />owner/operator, or the applicable local or state regulatory authority, it is determined that <br />the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br />discharges from the site. The SWPPP shall be modified as necessary to include <br />additional or modified BMPs designed to correct problems identified. Revisions to the <br />SWPPP shall be completed within seven days following inspection. <br />13:- Protect On -Site Stormwater Management BMPs for Runoff from Hard Surfaces <br />The use of on -site management BMP's.fof this project'will allow for'the`installation of the <br />infiltration trenches at the end of the project during final 'stabilization. That will protect <br />those areas from disturbance or compaction. In addition, the organic content of the <br />amended soils will be tested and verified prior,to:.final project' acceptance. <br />5. SOURCE CONTROL <br />This project proposes to construct a SFR and driveway. Per Volume 4 of the 2019 DOE <br />SWMMWW, residential development does not require source control <br />6. PRESERVATION OF NATURAL DRAINAGE SYSTEM <br />-The runofflrom the 'site improvements' will "'either' be dispersed on site or infiltrated via <br />infiltration trenches. However, by not grading or compacting the majority of the pervious <br />surfaces to remain after construction in the area of disturbance a maximum amount of site <br />runoff from the developed project will be absorbed and infiltrated into the existing on -site <br />soils. This will mimic the existing conditions by maintaining the existing direction and <br />condition of flow from this site. <br />Haack 75th SFR 20-0817 <br />September 2020 <br />Revised November2020 Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.