Laserfiche WebLink
2015 Washington State EnergyAWe Compliance Forms for Commercial, R2 and R3 over 4WQries and all R1 - Page 11 of 20 <br />2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 <br />Project Title: SnoPUD75BC Date 18/02/27 <br />The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the <br />Washington State Energy Code, Commercial Provisions. <br />Applicable <br />Code Section <br />Code Provision <br />I <br />Information Required - Must be in permit documents <br />I <br />Location in <br />I <br />Building Department <br />Jyes,no,na21 <br />Documents <br />Notes <br />C403.7, <br />Application of single duct <br />Indicate VAV terminal types on plans; verify fan -powered terminal units only serve perimeter <br />na <br />Item 11 <br />and fan -powered terminal <br />zones with envelope loads; verify all other zones are served by single duct terminal units <br />units <br />C403.7, <br />Fan -powered terminal unit <br />Indicate DDC controls are configured to automatically reset the primary supply air cfm setpoint <br />na <br />Item 12 <br />primary air reset <br />of all fan -powered terminal units to the minimum required to maintain ventilation during <br />occupied heating or deadband, based upon the VAV air handling unit OSA ventilation fraction <br />For spaces > 150 sf with occupant density >_ 25 people / 1000 sf, indicate space is served by a <br />C403.7, <br />High occupancy space <br />dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint; also <br />na <br />Item 13 <br />controls <br />indicate occupancy sensor control that automatically reduces minimum ventilation to zero and <br />sets back room heating and cooling setpoints by >_ 50F <br />For server, electronic equipment, telecom or similar spaces with cooling loads > 5 W/sf, <br />na <br />C403.7, <br />Dedicated HVAC systems <br />indicate spaces are served by independent HVAC systems that are separate from HPVAV <br />Item 14 <br />systems serving rest of building; indicate dedicated HVAC systems have air economizer <br />controls or energy recovery per C403.3 Exception 9 <br />Indicate whether systems are served by a high efficiency heating water plant, or a high <br />efficiency chilled water plant <br />If complying via high efficiency heating water plant: Indicate all VAV terminals have hydronic <br />heating coils served by heating water system with either gas -fired boiler(s) with thermal <br />C403.7, <br />efficiency t 90%, air -to -water heat pumps, or heat recovery chillers <br />na <br />Item 15 <br />Central plant efficiency <br />If complying via high efficiency chilled water plant: Indicate all VAV air handlers have cooling <br />coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least <br />25% per Table C403.2.3(7) (note water-cooled IPLV is max, all others are min); indicate <br />smallest chiller or compressor in plant is 5 20% of total plant capacity, or provide thermal <br />storage sized for < 20% of total plant capacity <br />C403.7, <br />Fault detection and <br />[Indicate DDC system includes a fault detection and diagnostics (FDD) system confgured to <br />na <br />Item 16 <br />diagnostics <br />onitor operation and provide fault reporting of required parameters for all VAV air handlers <br />nd VAV airterminal units in the HPVAV system <br />HVAC Equipment <br />Energy <br />Use Metering <br />HVAC equipment energy <br />For new buildings > 50,000 sf and building additions > 25,000 sf, verify energy use metering of <br />na C409.3.1 <br />all equipment used to provide space heating and cooling, dehumidification and ventilation will <br />The <br />use metering <br />provided per C409; indicate equipment eligible for exception <br />Documentation and System Specific Requirement To Support Commissioning <br />Indicate that all mechanical systems, equipment, and controls for which the WSEC requires <br />control functions and / or configuration to perform specific functions are required to be <br />commissioned; <br />C408.2 <br />Scope of mechanical <br />systems commissioning <br />For buildings with >_ 240,000 Btu/h total output cooling capacity or >_ 300,000 Btu/h total output <br />na <br />heating capacity, indicate that all mechanical systems regardless of individual capacity are <br />required to be commissioned; or provide building heating / cooling capacity calculation <br />demonstrating eligibility for exception <br />Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical <br />C403.2.10 <br />systems; <br />Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 <br />C408.1.1 <br />Commissioning <br />including: narrative description of activities, responsibilities of the Cx team, schedule of <br />C408.1.2 <br />requirements in construction <br />activities including verification of project close out documentation per C103.6, and conflict of <br />na <br />C408.1.4.2 <br />documents <br />interest plan (if required); <br />C103.6 <br />Include in general summary that a Cx project report or Compliance Checklist (Figure <br />C408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner <br />prior to the final mechanical inspection. <br />Air system and hydronic <br />Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances <br />na <br />C408.2.2 <br />system balancing <br />defined in the specifications; indicate systems shall be balanced in a manner to first minimize <br />throttling losses, then adjusted to meet design flow conditions <br />na <br />C408.2.2.1 <br />Air system balancing <br />Indicate devices that provide the capability to balance all supply air outlets, zone terminals and <br />devices <br />air handling equipment requiring system balancing <br />na <br />C408.2.2.2 <br />Hydronic system balancing <br />Indicate devices that provide the capability to isolate, balance and measure flow across all <br />devices <br />hydronic equipment requiring system balancing including heating and cooling coils and pumps <br />C408.2.3 <br />Functional performance <br />Identify in plans and specifications the intended operation of all equipment and controls during <br />na <br />testing criteria <br />all modes of operation, including interfacing between new and existing -to -remain systems <br />Project Close Out Documentation <br />Documentation and project <br />Indicate in plans that project close out documentation and training of building operations <br />NA <br />C103.6 <br />close out submittal <br />personnel is required for all mechanical components, equipment and systems governed by this <br />requirements <br />code; indicate dose out documentation shall include: record documents, O&M manuals, <br />applicable WSEC compliance forms and calculations <br />