My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County PUD 10/29/2021
>
Contracts
>
6 Years Then Destroy
>
2025
>
Snohomish County PUD 10/29/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:15 AM
Creation date
11/12/2021 10:35:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County PUD
Approval Date
10/29/2021
Council Approval Date
10/20/2021
End Date
9/30/2025
Department
Transportation Services
Department Project Manager
Melinda Adams
Subject / Project Title
Resonant Magnetic Induction Charging Station
Tracking Number
0003083
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2A1A1 B97-7E1 2-4D08-A7FA-F9FBEB801 815 <br /> Milestone Project Activity and Task Key Deliverable(s) Deliverable Description <br /> A Project Development and <br /> Confirmation <br /> Project Plan Overview document Executive summary and project plan. <br /> Procurement Plan Report document Report describing the procurement plan. <br /> Risk Plan Report document Report describing the risk management plan. <br /> Load Management Plan Overview document Documentation of load management strategy including applicable technology <br /> and methodology to be utilized, and expected data to be collected. <br /> B Engineering Design <br /> EVSE System Procurement technical specs Final equipment technical specifications for procurement of EVSE supplies and <br /> installation services. <br /> Electrical design 100%design submittal Letter of Confirmation to(sub)contractor that design efforts are complete or <br /> sufficient for issuing"For Construction"drawing package. <br /> Project schedule MS Project Report or similar MS Project Report or similar report detailing anticipated project schedule. <br /> Civil design and permitting 100%design submittal Letter of Confirmation to(sub)contractor that design efforts are complete or <br /> sufficient for issuing "For Construction"drawing package. <br /> C Contracting &Procurement <br /> Civil work Copy of award letter and contract Contract award letter, contract summary and Notice to Proceed. <br /> EVSE Supply and Installation Copy of award letter and contract Contract award letter, contract summary and Notice to Proceed. <br /> EVSE Signage Design &Contract Copy of contract&design Copy of proposed signage design and printing invoice and/or contract <br /> D Equipment Delivery, Installation& <br /> Construction <br /> Project construction schedule status update and Letter of Confirmation to <br /> Site preparation/Civil work Substantial completion of contract (sub)contractor stating site preparation and civil work is"substantially <br /> complete". <br /> EVSE installation System delivered and installed Project construction schedule, Bill-of-material and delivery dates with status <br /> memo. <br /> EVSE Signage installation Signage delivered and installed Photos of installed signage and summary report. <br /> Change Order Change order management plan COMP will include roles, authority, approval and communication plans. <br /> E Contingency <br /> Grantee will submit a change order approved by themselves. The total cost <br /> Contingency Approved Change Order from contingency and justification must be included. Change must be approved <br /> by Commerce to be eligible for funding. Upon approval, Commerce will issue <br /> payment for up to 90.9%of the cost of the change order, up to$41,290. <br /> F Systems Integration & <br /> Commissioning <br /> EVSE commissioning Certified SAT report Letter of Confirmation to(sub)contractor EVSE System Acceptance Test <br /> complete with copy of Certified Acceptance Test. <br /> Load Management technology System integration report Report confirming that load management technology integration is complete. <br /> integration <br /> G Analytics& Monitoring <br /> Utilization data monitoring Charger status and usage reports Vendor to provide cloud based portal for data access and reporting, aggregated <br /> usage data from first six months' use submitted to Commerce. <br /> Maintenance Plan Operation and Maintenance Training and Vendor to provide training and manuals for operation and maintenance. <br /> Manuals <br /> Load Management data analytics Load Management reports Report summarizing load management impact. <br /> Contract#«Contract Number» 19 Electrification of Transportation Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.