2.8. Issue Job Order: Once City is satisfied with the Price Proposal and related documents, and decides to move <br /> forward with the project,City is then responsible for the issuance of a job order(which may be in the form of a <br /> purchase order)to the selected JOC Contractor. <br /> 2.9. Construction Management: During construction, City's project managers will follow its standard internal <br /> policies and procedures for construction management and site inspections,including coordinating any required <br /> code inspections. When unforeseen conditions arise or City desires to change the Detailed Scope of Work, a <br /> supplemental Job Order is developed in the same manner as the original Job Order. <br /> 3. TIER 3 OPTIONAL JOC GORDIAN SERVICES: On a project-by-project basis, Gordian shall provide Tier 3 <br /> Optional Services(also referred to as Project Management Services)to City,at City's sole discretion. Upon request, <br /> Gordian will provide the following Project Management Services: <br /> 3.1. Preconstruction — Gordian's project manager will assist City in determining whether professional design <br /> services are required and conduct a pre-construction meeting with the City's representative(s),the JOC contractor <br /> and, if applicable,the architect or engineer to review the basic project parameters and funding. Where design <br /> services are required, the project manager will work with the architects or engineers to coordinate necessary <br /> studies and design standards and deliver plans and specifications that maximize the benefits of JOC for each <br /> City project.Next,the project manager will coordinate and share any preconstruction information with City,the <br /> JOC contractor and other appropriate parties,and will assist in the coordination of the JOC contractor obtaining <br /> the necessary permits. <br /> 3.2. Site Visit—During construction,Gordian's project manager will monitor the JOC contractor's work in-progress, <br /> manage the JOC contractor's compliance with the approved safety plan and complete a report for each site visit. <br /> 3.3. Communication—Gordian's project manager will provide weekly construction status reports to City,conduct <br /> project progress meetings with the JOC contractor and staff on a periodic basis, and coordinate any required <br /> technical and code inspections. <br /> 3.4. Supplemental Job Orders — In the event there are unforeseen conditions or City requests changes to the <br /> Detailed Scope of Work after construction has begun, Gordian's project manager will analyze and process a <br /> supplemental Job Order by utilizing the procedures to develop the initial Job Order. <br /> 3.5. Approvals—Gordian's project manager will review and recommend for approval,or direct necessary revisions <br /> to,the JOC contractor's applications for payment and obtain City's approval of the work. Final acceptance of <br /> the work will be the responsibility of City. Technical and code inspections will be the responsibility of the <br /> appropriate inspection agencies. <br /> 3.6. Project Close-out—As the final step in the process,Gordian's project manager will enter all Job Order related <br /> information into the JOC IMS and collect any required as-builts,warranties and OEMs from the JOC contractor. <br /> 4. OPTIONAL CONSTRUCTION COST ESTIMIATING: <br /> 4.1. When requested by the City,Consultant will be responsible for providing Estimating Services for each Job Order <br /> as described below: <br /> 4.1.1. Work with owner to gather historical and existing site-specific documentation. <br /> 4.1.2. Arrange a site visit with owner personnel to explore and document scope requirements <br /> 4.1.3. Establish a scope and quantity line-item estimate based on current CTC contract terms at a Factor of 1.000. <br /> Gordian Group,Inc.Professional Services Agreement(2021) <br />