My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Inc. 10/29/2021 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2022
>
HDR Inc. 10/29/2021 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2021 1:51:35 PM
Creation date
11/12/2021 1:51:23 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Inc.
Approval Date
10/29/2021
Council Approval Date
10/20/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port Gardner Storage Facility-Facilities Plan
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002288
Total Compensation
$1,033,490.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF SERVICES <br /> Background <br /> The City of Everett, Washington (City) is currently in the process of converting the Kimberly- <br /> Clark treatment facilities into the Port Gardner Storage Facility (PGSF) in order to control the <br /> remaining active combined sewer overflow (CSO) sites along the City's waterfront. <br /> Under Task 800.2, HDR completed the Port of Everett Combined Sewer Main Improvements <br /> design which included the design of a 42-inch combined sewer gravity main and parallel 12-inch <br /> force main (approximately 2,350 LF each) prior to the commencement of the future Port of <br /> Everett Maritime Industrial Expansion — Norton Terminal project. This pipeline (defined as <br /> Conveyance Option CO18 in the PGSF Conveyance Alternative Technical Memorandum dated <br /> April 14, 2021) will allow combined sewer flows to be pumped either directly from Lift Station 2 <br /> (LS2) or from Lift Station 3 (LS3)to the future PGSF. This project also be used in reverse to <br /> provide operational resiliency by pumping from the future Lift Station X located adjacent to the <br /> PGSF back to LS3. <br /> The intent of this scope of services is to provide an amendment to perform bid phase services <br /> for the Port of Everett Combined Sewer Main Improvements project. The scope and budget for <br /> construction phase services will be included as part of Amendment No. 2. <br /> Scope of Services <br /> Task 100 — Project Management <br /> Objective <br /> Monitor, control, and adjust scope (upon mutual agreement), schedule, and budget as well as <br /> provide monthly status reporting, accounting, and invoicing and project coordination with the <br /> City. <br /> Subtask 101 — Project Control <br /> Consultant Services <br /> 1. Continuation of original scope of work. <br /> Client Responsibilities <br /> 1. Continuation of original scope of work. <br /> Assumptions <br /> 1. This amendment increases the project duration by 12 months. <br /> 2. This amendment increases the fee due to the extension of the duration of the contract. <br /> Deliverables <br /> 1. Continuation of original scope of work. <br /> City of Everett—PGSF Amendment No. 1 1 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.