Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF SERVICES <br /> Background <br /> The City of Everett, Washington (City) is currently in the process of converting the Kimberly- <br /> Clark treatment facilities into the Port Gardner Storage Facility (PGSF) in order to control the <br /> remaining active combined sewer overflow (CSO) sites along the City's waterfront. <br /> Under Task 800.2, HDR completed the Port of Everett Combined Sewer Main Improvements <br /> design which included the design of a 42-inch combined sewer gravity main and parallel 12-inch <br /> force main (approximately 2,350 LF each) prior to the commencement of the future Port of <br /> Everett Maritime Industrial Expansion — Norton Terminal project. This pipeline (defined as <br /> Conveyance Option CO18 in the PGSF Conveyance Alternative Technical Memorandum dated <br /> April 14, 2021) will allow combined sewer flows to be pumped either directly from Lift Station 2 <br /> (LS2) or from Lift Station 3 (LS3)to the future PGSF. This project also be used in reverse to <br /> provide operational resiliency by pumping from the future Lift Station X located adjacent to the <br /> PGSF back to LS3. <br /> The intent of this scope of services is to provide an amendment to perform bid phase services <br /> for the Port of Everett Combined Sewer Main Improvements project. The scope and budget for <br /> construction phase services will be included as part of Amendment No. 2. <br /> Scope of Services <br /> Task 100 — Project Management <br /> Objective <br /> Monitor, control, and adjust scope (upon mutual agreement), schedule, and budget as well as <br /> provide monthly status reporting, accounting, and invoicing and project coordination with the <br /> City. <br /> Subtask 101 — Project Control <br /> Consultant Services <br /> 1. Continuation of original scope of work. <br /> Client Responsibilities <br /> 1. Continuation of original scope of work. <br /> Assumptions <br /> 1. This amendment increases the project duration by 12 months. <br /> 2. This amendment increases the fee due to the extension of the duration of the contract. <br /> Deliverables <br /> 1. Continuation of original scope of work. <br /> City of Everett—PGSF Amendment No. 1 1 Scope of Services <br />