Laserfiche WebLink
410 • <br /> of ignition,openings into direct vent(sealed combustion system)appliances,or <br /> mechanical ventilation air intakes. <br /> 4. The filling connection and the vent from liquid-level gauges on either DOTn or ASME LP- <br /> gas containers filled at the point of installation shall be not less than 10 feet from exterior <br /> sources of ignition,openings into direct vent(sealed combustion system)appliances or <br /> mechanical ventilation air intakes. <br /> The distance from exterior sources of ignition,openings into direct vent(sealed combustion system) <br /> applicants or mechanical ventilation air intake is 12'and the distance from the propane tank to the <br /> right of way is 12'. Please see updated site plan attached. <br /> Thank you, <br /> Richard Smith <br /> Newland Construction Co., Inc. <br />