Laserfiche WebLink
July 2,2019 <br /> 150-ft Monopole Tower Structural Analysis Report CCI BU No 826263 <br /> TEP Project Number 46302.272033, Order 497627, Revision 0 Page 2 <br /> TABLE OF CONTENTS <br /> 1) INTRODUCTION <br /> 2)ANALYSIS CRITERIA <br /> Table 1 - Proposed Equipment Configuration <br /> Table 2-Other Considered Equipment <br /> 3)ANALYSIS PROCEDURE <br /> Table 3- Documents Provided <br /> 3.1)Analysis Method <br /> 3.2)Assumptions <br /> 4) ANALYSIS RESULTS <br /> Table 4-Section Capacity(Summary) <br /> Table 5-Tower Component Stresses vs. Capacity <br /> 4.1) Recommendations <br /> 5) APPENDIX A <br /> tnxTower Output <br /> 6)APPENDIX B <br /> Base Level Drawing <br /> 7) APPENDIX C <br /> Additional Calculations <br /> tnxTower Report-version 8.0.5.0 <br />