My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2215 MERRILL CREEK PKY T MOBILE ANTENNA 2021-11-15
>
Address Records
>
MERRILL CREEK PKY
>
2215
>
T MOBILE ANTENNA
>
2215 MERRILL CREEK PKY T MOBILE ANTENNA 2021-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 11:22:16 AM
Creation date
11/15/2021 11:21:24 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2215
Tenant Name
T MOBILE ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> CCROWN <br /> Seat1505 Westlake Ave N Phone: (206) 336-3204 <br /> Seattle,WA 98109 Fax <br /> :** CASTLE www.crowncastle.com <br /> October 2,2019 <br /> City of Everett <br /> Permit Services <br /> 320o Cedar St. DEC 0 6 2Of9 01 Everett,WA 982 <br /> CITY® <br /> Permit e VERET T <br /> RE: Eligible Facilities Request to modify equipment on a communications tower locate: <br /> 2215 Merrill Creek Pky,Everett,WA,98203 <br /> Crown Site Number:826263/Crown Site Name:Norpro <br /> Customer Site Number:SEoi686A/Application Number:497627 <br /> Crown Castle USA Inc.("Crown Castle")on behalf of T-Mobile West LLC("T-Mobile")is submitting the attached <br /> Eligible Facilities Request application to modify transmission equipment on a telecommunications tower located at 2215 <br /> Merrill Creek Pky,Everett,WA 98203 in CITY OF EVERETT,WA(the"Norpro Tower"). <br /> Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012,commonly known as the"Spectrum Act" <br /> (Pub.Law No.112-96,126 Stat 156),mandates that state and local governments"may not deny,and shall approve,any <br /> eligible facilities request for a modification of an existing wireless tower or base station that does not substantially <br /> change the physical dimensions of such tower or base station." Additionally,if"the reviewing State or local government <br /> determines that the application is incomplete"[they]"must provide written notice to the applicant within 30 days of <br /> receipt of the application,clearly and specifically delineating all missing documents or information." Under federal law, <br /> an Eligible Facilities Request is deemed granted with written notification in sixty(6o)days after an application is filed <br /> with a local jurisdiction,excluding tolling. <br /> T-Mobile proposes to modify the"Norpro Tower"as follows: <br /> Replace(4)antennas;remove(1)RRU,(1)junction box,and(3)TMA's;and install(2)antennas,(i)junction <br /> box,and(2)HCS cables on existing tower.T-Mobile also proposes to replace(2)cabinets;remove(I)cabinet, <br /> (6)diplexers,(1)junction box,all FRIA,all ESMB,all FSME,all ESMB,and(2)AMOB;relocate(6)modules; <br /> and install(i)FSMF,(I)FBBC,(4)AMIA with(50)modules,and(i)CSR within existing compound. <br /> Itemized list of submittal documents: <br /> • (1)Cover Letter <br /> • (1)Permit Application <br /> • (3)Structural Analysis stamped by Washington State engineer <br /> • (3)Construction Drawings stamped by Washington State engineer—ii"x17"print <br /> • Payment—PLEASE INVOICE <br /> T-Mobile is committed to working cooperatively with all jurisdictions around the country to secure expeditious approval <br /> of requests to modify existing personal wireless service facilities. If you should require more information regarding the <br /> Spectrum Act,please do not hesitate to contact me with your questions. <br /> The Foundation for a Wireless World. <br /> CrownCastle.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.