My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1907 W MUKILTEO BLVD 2021-11-15
>
Address Records
>
W MUKILTEO BLVD
>
1907
>
1907 W MUKILTEO BLVD 2021-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 11:57:54 AM
Creation date
11/15/2021 11:57:02 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
1907
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I • <br /> • <br /> Pearson Property Slope Stabilization NGA File No 945216 <br /> 1907 West Mukilteo Boulevard February 19,2016 <br /> Everett,Washington Page 8 <br /> anchors or mechanical anchors such as helical anchors. The new retaining wall should be generally <br /> located just setback from the existing top of the steep slope along the entire width of the property. The <br /> final extent and heights of the new retaining wall should be determined based on an accurate survey of the <br /> property. However,we recommend that the exposed portion of the new wall not exceed eight feet,but be <br /> no less than six feet. <br /> The retaining wall should be designed by an experienced structural engineer licensed in the State of <br /> Washington. The wall should be designed to resist an active pressure acting on the piles and lagging for <br /> design of the piles and should be calculated based on a triangular pressure distribution equivalent to that <br /> exerted by a fluid with a density of 60 pcf. This value is based on loads from the undocumented fill and <br /> loose soils that will remain behind the wall. A uniform surcharge of 8H should be applied to the wall <br /> design to account for seismic loading, where H is the total height of the wall. <br /> The above active load should be applied on the full center-to-center pile spacing above the base of the <br /> exposed portion of the wall. A 50 percent reduction of this value can be used for the purpose of designing <br /> the wall lagging. The active pressure should be entirely resisted by the tieback anchors. Passive <br /> resistance on the below grade portion of the piles should not be included in the design. <br /> We recommend that the piles be driven into place using a hydraulic hammer, with a minimum energy <br /> rating of at least 1,500 ft-lb. The piles should be spaced at a maximum distance of 4 feet, and should be <br /> embedded a minimum of 20 feet into the competent slope material below the fill. In addition to the <br /> minimum recommended embedment into the native material, the piles should be driven to a refusal <br /> criteria of less than one inch of movement during 15 seconds of continuous driving. Our explorations <br /> encountered loose undocumented fills within the planned retaining wall area. If large particles or debris <br /> are present within the fill, there is a possibility that this material may obstruct some piles at shallow <br /> depths. There should be contingencies in the budget and design for additional/relocated piles to replace <br /> piles that may be obstructed by debris in the fill. The wall lagging should be embedded a minimum of <br /> 12 inches into the finished slope face within the competent glacial soils. Any backfill placed behind the <br /> wall should consist of clean 2-inch crushed rock. The crushed rock should be tamped in place using hand <br /> tools to ensure all gaps are entirely filled. We should be retained to review final plans, observe test pile <br /> installation prior to finalizing design, monitor installation of the piles,and evaluate pile refusal. <br /> Tie-backs <br /> General: These systems should consist of drilled, grouted tieback anchors, or mechanically installed <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.