My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Krazan and Associates Inc. 11/4/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Krazan and Associates Inc. 11/4/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2021 1:13:21 PM
Creation date
11/19/2021 1:12:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Krazan and Associates Inc.
Approval Date
11/4/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Geotechnical Services for Water Main Repl W
Public Works WO Number
UP3766
Tracking Number
0003094
Total Compensation
$22,451.18
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit -1 <br /> I & A S S O C I A T E S, I N C. <br /> GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING <br /> CONSTRUCTION TESTING & INSPECTION <br /> October 5,2021 Proposal No.G21870WAL <br /> Page 1 <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> Attn: Ms.Arnie Roshak PE,PMP <br /> Reference: Proposal for Geotechnical Engineering Investigation <br /> UP No.3766,Water Main Replacement"W" <br /> Wilmington Avenue and Hoyt Avenue <br /> Everett,WA <br /> Dear Ms.Roshak: <br /> We are pleased to present our scope of work and cost estimate to conduct a geotechnical engineering <br /> investigation for the Water Main Replacement"W"project. This proposal has been developed based on <br /> the information that was provided in your email dated September 15, 2021. The email included a <br /> Geotechnical Engineering Scope of Work(Exhibit A-1)and maps showing the approximate alignments of <br /> two planned water main replacements. We also based this proposal on a review of available topographic <br /> and geologic maps of the site areas, aerial photographs of the site areas, as well as experience with <br /> projects of similar size and scope. Exhibit A-1 also included descriptions of the planned water main <br /> replacements as summarized in the following table: <br /> Road From To Replacement Pipe <br /> Wilmington Avenue Evergreen Way 52nd Street 8-inch Ductile Iron <br /> Hoyt Avenue 41st Street 44a'Street 12-inch Ductile Iron <br /> It is our current understanding that the new water main will include approximately 2,000 lineal feet of 8- <br /> inch diameter, and 1,420 lineal feet of I2-inch diameter ductile iron water pipe. We anticipate that the <br /> water main will be installed with about 36 to 48 inches of cover using standard trench excavation <br /> techniques. The project will also include removal or abandonment of valves,fire hydrants,water service <br /> lines and installation of new water meter boxes and setters,related appurtenances and surface restoration. <br /> The water main lines will be located within City of Everett Right-Of-Way(ROW)and easements. <br /> Offices Serving The Western United States <br /> 4303—198th Street SW•Lynnwood,Washington 98036•(425)485-5519•Fax(425)485-6837 <br />
The URL can be used to link to this page
Your browser does not support the video tag.