Laserfiche WebLink
KRAZAN&ASSOCIATES,INC. <br /> Proposal No. G21870WAL <br /> Everett Water Main Replacement"W" <br /> Everett, WA <br /> October 5,2021 <br /> Page 2 <br /> SCOPE OF SERVICES <br /> Our geotechnical services will be performed in general accordance with the scope of services as presented <br /> in Exhibit A-1. Below is a summary of the services to be provided: <br /> 1. Review Previous Geologic and Subsurface Information <br /> A. Review available subsurface information, existing construction data and other <br /> available geotechnical reports for the site vicinity. <br /> 2. Plan the Exploration Program and Obtain Permits <br /> A. Exploration Program: <br /> i. The water main alignments are in areas mapped as glacially compacted soils. <br /> We plan to explore the site with approximately nine(9)geotechnical borings: <br /> • Five (5) borings are planned in Wilmington Avenue with <br /> spacing of 300 to 400 feet along the proposed alignment; <br /> • Four(4)borings are planned in Hoyt Avenue with spacing of <br /> 300 to 400 feet along the proposed alignment; <br /> ii. The borings will primarily be located within the paved surface to allow <br /> measurement and documentation of the pavement type and thickness. The <br /> boring locations have been chosen to minimize interference with traffic flow <br /> at the intersections and to provide representative samples of the subsurface <br /> conditions. The borings will likely extend to depths of approximately 9.0 <br /> feet below the pavement surface depending on soil conditions. <br /> B. Submittals: We understand that the City Traffic Engineering Group will provide <br /> standard traffic control plans,which will be submitted along with the boring locations <br /> to the City of Everett for review for right-of-way permit applications. We plan to <br /> notify the public to avoid parking in the planned exploration areas by posting no <br /> parking signage with a minimum lead time of 48 hours prior to the start of drilling. <br /> We will remove the no parking signage after the work is completed. <br /> 3. Field Exploration and Laboratory Testing <br /> A. Site Visit to Clear Boring Locations:We will plan a visit to the project site prior to <br /> the explorations to mark the proposed soil boring locations for the underground <br /> utility locates. The public utility locate service will then be notified of our planned <br /> explorations. We also plan to subcontract a private utility locate company to evaluate <br /> whether there are subsurface utilities near the soil boring locations. After the boring <br /> locations are cleared,Krazan would be available to coordinate with the City's Survey <br /> Consultant to allow the boring locations to be surveyed prior to the completion of the <br /> surveyor's field work. <br /> Krazan&Associates,Inc. <br /> Offices Serving The Western United States <br />