Laserfiche WebLink
KRAZAN&ASSOCIATES,INC. <br /> Proposal No. G2I 870WAL <br /> Everett Water Main Replacement"W" <br /> Everett, WA <br /> October 5,2021 <br /> Page 5 <br /> 7. Prevailing Wages <br /> Our cost estimate includes prevailing wages for drilling and traffic control operations. <br /> COST ESTIMATE <br /> A detailed unit price schedule and budget estimate for the scope of a geotechnical engineering <br /> investigation and report is attached to this proposal for your review. In developing this cost estimate, <br /> we have assumed that adequate access will be available to the soil boring locations,and that permission to <br /> access the site will be provided by you. <br /> We have also included a copy of the WSDOT Acceptance FYE 2018 ICR letter for Krazan for your <br /> review. <br /> The estimated total cost is based on our being able to acquire sufficient information with the proposed <br /> field investigation methods. If unforeseen conditions are encountered and we are not able to complete the <br /> study at the proposed cost, we will contact you immediately to discuss a revised scope of work and a <br /> revised cost estimate. <br /> We should be able to mobilize and begin our investigation as soon as practical, primarily based on the <br /> availability of the subcontracted drill rig,and assuming we have acceptable access to the property. Please <br /> arrange access to the site and inform us of the locations of any underground utilities. <br /> CLOSURE <br /> Thank you for this opportunity to present our proposal for geotechnical engineering services. If you have <br /> any questions,feel free to contact us at(425)485-5519. <br /> An Agreement for Geotechnical Engineering Services can be provided on request. <br /> Sincerely, <br /> Krazan&Associates,Inc. <br /> ILL(. <br /> Michael D. Rundquist,P.E. <br /> Senior Project Engineer <br /> Krazan&Associates,Inc. <br /> Offices Serving The Western United States <br />