Laserfiche WebLink
Exhibit B-1 <br /> Subconsultant Fee Determination - Summary Sheet <br /> (Mandatory when Subconsultants are utilized) <br /> Project: City of Everett UP No. 3766-Water Main Replacement'W <br /> Sub Consultant: Krazan and Associates, Inc. - Proposal No. G21870WAL <br /> Direct Salary Cost(DSC): <br /> Classification Man Hours Rate Cost <br /> Senior Geotechnical Engineer 4 x $46.10 = $ 184.40 <br /> Project Engineer/Geologist 56 x $32.43 = $ 1,816.08 <br /> Total DSC = $ 2,000.48 <br /> Overhead (OH Cost-- including Salary Additives): <br /> OH Rate x DSC of 162.99% x $ 2,000.48 = $ 3,260.55 <br /> Fixed Fee (FF): <br /> FF Rate x DSC of 30.00% x $ 2,000.48 = $ 600.14 <br /> Reimbursables: <br /> Itemized <br /> Laboratory Services = $ 1,990.00 <br /> Traffic Control Plan and Flaggers(cost+5%) _ $ 3,675.00 <br /> Drill Rig&Concrete Coring (cost+5%) = $ 8,400.00 <br /> Private Utility Locate(cost+5%) _ $ 525.00 <br /> Total reimbursables = $ 14,590.00 <br /> SubConsultansts Total: = $ 5,861.18 <br /> Contingency = $ 2,000.00 <br /> Grand Total $ 22,461.18 <br /> Prepared By: Michael D. Rundquist, P.E. Date: 10/4/2021 <br /> DOT Form 140-089 EF Exhibit G-1 <br /> Revised 01-09 <br />