Laserfiche WebLink
OiiKrazan <br /> Project Experience <br /> Project:Water Mains N,0,0, U&V Replacements—Everett,WA <br /> -I Description: These projects involved subsurface investigations and geotechnical <br /> li " iI engineering recommendations for replacement of aging water mains. <br /> Services Provided:Krazan provided geotechnical engineering investigations to evaluate <br /> . the subsurface soil and groundwater conditions at these sites; a review of available <br /> - 0 <br /> -' geotechnical reports pertaining to subsurface soil and groundwater conditions in the <br /> general site area; laboratory testing; recommendations for earthwork and site <br /> ',! preparation including the suitability of on-site soils for trench backfill, placement and <br /> `a compaction of on-site soils, the mitigation of unsuitable soil conditions, and an <br /> --Ni <br /> .. evaluation of weather sensitivity during construction; recommendations for <br /> conventional trenching techniques, excavation, pipe support, erosion control during <br /> construction, and construction dewatering considerations;and recommendations for <br /> seismic design considerations including site coefficient and ground acceleration <br /> Al <br /> ,_ : _ .: a. information. <br /> Client:City of Everett—Richard Hefti(retired) <br /> Project:Smith-Park Infiltration Study—Monroe,WA <br /> Description:This project included the replacement of the aging water and sewer lines in <br /> the areas of Smith Street and Park Street.The infiltration portion of the project includes <br /> Park Street,from about Monroe Street at the southern end to about Pike Street to the <br /> Y., . p north. <br /> "' Services Provided: Our scope included explorations of the subsurface soil and <br /> groundwater conditions, laboratory testing, determination of infiltration rates, organic <br /> content,and Cation Exchange Capacity(CEC)and a geotechnical engineering report. <br /> Client:City of Monroe—James Gardner,Tel: (360)863-4542 <br /> Project:Roosevelt High School Athletic Field Lighting—Seattle, WA <br /> :..:- Description: This project consists of a synthetic turf field with a six lane running track <br /> surrounding it. The scope of the project included installing 4 to 6 pole mounted athletic <br /> i field lighting. A geotechnical exploration and analysis soils report was required for the <br /> 1 design of the lighting foundations. <br /> Services Provided: Krazan performed geotechnical explorations and provided <br /> recommendations for new pole mounted athletic field lighting foundations. <br /> Client:Seattle Public School—David Standaart,Tel:(206)252-0662 <br /> Project:Dickinson Utility Replacement Project—Monroe,WA <br /> ; Description:This project included the replacement of aging utilities in Dickinson Road. <br /> The project also included stormwater infiltration services at various locations along <br /> ' %N Dickinson Road. <br /> Services Provided: Geotechnical engineering explorations, soil compaction testing, and <br /> stormwater monitoring, infiltration studies, and related laboratory testing. <br /> Client:City of Monroe—Kim Klinkers,Tel:(360)863-4531 <br />