My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/11/17 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/11/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 8:07:00 PM
Creation date
11/22/2021 8:11:29 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
liquidated damages for each calendar day that Substantial Completion extends beyond the <br />Scheduled Substantial Completion Date. <br />6.4.1.2 For each subsequent calendar day beyond the Initial Period, eight thousand <br />Dollars ($8,000) as liquidated damages for each calendar day that Substantial Completion <br />extends beyond the Scheduled Substantial Completion Date. <br />6.4.2 Design -Builder understands that if Final Completion is not achieved by the Scheduled Final <br />Completion Date, Owner will suffer damages which are difficult to determine and accurately specify. <br />Design -Builder agrees that if Final Completion is not achieved by the Scheduled Final Completion Date, <br />Design -Builder shall pay to Owner five hundred Dollars ($500), as liquidated damages for each calendar <br />day that Final Completion is delayed beyond the Scheduled Final Completion Date. <br />6.4.3 The categories of liquidated damages set forth above are cumulative and may accrue <br />simultaneously. <br />6.4.4 Any liquidated damages assessed pursuant to this Contract shall be in lieu of all monetary <br />liability for any and all extra costs, losses, expenses, claims, penalties and any other damages, whether <br />special or consequential, and of whatsoever nature incurred by Owner which are caused by any delay in <br />achieving Substantial Completion or Final Completion, provided this limitation shall not apply to Design - <br />Builder's duty to indemnify the Owner or to warrant Design -Builder's Work as provided in this Contract and <br />shall not apply to any loss, damage, cost or liability incurred by Owner due to factors unrelated to Design - <br />Builder's delay. <br />Article 7 <br />Price <br />7.1 Phase 1 Price. For completion of the Phase 1 Scope of Services (Exhibit C), Owner shall pay <br />Design -Builder in accordance with Article 8 of this Contract and Article 6 of the General Conditions a sum <br />not to exceed Seven Hundred Fifty Three Thousand and Seventy -Nine Dollars ($753,079.00). Phase 1 <br />Services shall be billed at the all-inclusive billing rates and labor categories set forth in Exhibit E which <br />rates shall not be subject to increase for any Phase 1 services. Unless otherwise provided in the Contract <br />Documents, the Phase 1 Services compensation is deemed to include all sales, use, consumer and other <br />taxes mandated by applicable Legal Requirements. <br />7.2 Phase 2 Price. For Phase 2 Services, Owner shall pay Design -Builder in accordance with Article <br />8 of this Contract and Article 6 of the General Conditions a contract price ("Contract Price") set forth in the <br />GMP Amendment which shall be equal to the Pass -Through Costs (as defined in Section 7.5.3 hereof), <br />plus Design -Build Fee percentage (as defined in Section 7.4 hereof) applied to the Cost of the Phase 2 <br />Work, plus the Construction General Conditions Fee (as defined in Section 7.3 hereof), plus the Cost of the <br />Phase 2 Work (as defined in Section 7.5.1 hereof) , subject to the GMP established in the GMP Amendment <br />and governed by Section 7.6 hereof, and any adjustments made in accordance with the General Conditions. <br />7.3 Construction General Conditions Fee. Owner shall pay the Lump Sum Construction General <br />Conditions Fee of Two Hundred Eighty Thousand Dollars ($280,000.00) for all Construction General <br />Conditions Work as defined in Exhibit D. The Construction General Conditions Fee shall be paid monthly <br />based on the percent of Cost of Work completed in the month covered by Design -Builder's pay application. <br />The Construction General Conditions Fee shall cover all Construction General Conditions Work, regardless <br />of whether the work is completed by the Design -Builder, a Key Firm, or Subcontractor. <br />7.4 Design -Build Fee. <br />7.4.1 Design -Build Fee shall be Fifteen percent (15%) of the Cost of the Phase 2 Work, as <br />adjusted in accordance with Section 7.4.2 below. <br />PROGRESSIVE DESIGN -BUILD CONTRACT, Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.