My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/11/17 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/11/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 8:07:00 PM
Creation date
11/22/2021 8:11:29 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.4.2 Design -Build Fee will be adjusted as follows for any changes in the Work as set forth in a <br />Change Order and in accordance with the requirements of Article 9 of the General Conditions. It is agreed <br />that Design -Builder shall receive a fee for overhead and profit of Fifteen percent (15%) of the additional <br />Cost of the Phase 2 Work incurred for that Change Order. <br />7.5 Cost of the Phase 2 Work. <br />7.5.1 Cost of the Phase 2 Work includes only those items expressly defined in this Section 7.5.1 <br />that are reasonably incurred by Design -Builder in the proper performance of the Phase 2 Work. The Cost <br />of the Phase 2 Work shall not include any Pass -Through Costs (as defined in Section 7.5.3 hereof), <br />Construction General Conditions Work (as defined in Section 7.3 hereof), or costs intended to be covered <br />by the Design -Build Fee (as defined in Section 7.4 hereof). For the avoidance of doubt, any confusion about <br />the categorization of cost items between the Cost of the Phase 2 Work and Pass -Through Costs shall be <br />resolved in favor of Pass -Through -Costs. Further, any confusion about the categorization of cost items <br />between the Cost of the Phase 2 Work and Construction General Conditions Fee or Design -Build Fee shall <br />be resolved in favor of Construction General Conditions Fee and Design -Build Fee, respectively. The Cost <br />of the Phase 2 Work shall include only the following: <br />7.5.1.1 Except for those supervisory and administrative personnel who are covered by the <br />General Conditions Fee (Exhibit D) and employees billed at all-inclusive billing rates (Exhibit E), wages of <br />direct employees of Design -Builder performing the Work at the Site or, with Owner's agreement, at locations <br />off the Site. <br />7.5.1.2 Except for those supervisory and administrative personnel who are covered by the <br />General Conditions Fee (Exhibit D) and employees billed at all-inclusive billing rates (Exhibit E), wages <br />or salaries of Design -Builder's personnel engaged in the performance of the Work and who are located at <br />the Site or working off -Site to assist in the production or transportation of material and equipment necessary <br />for the Work. <br />7.5.1.3 Except for those supervisory and administrative personnel who are covered by <br />the General Conditions Fee (Exhibit D) and employees billed at all-inclusive billing rates (Exhibit E), wages <br />or salaries of Design -Builder's personnel stationed at Design -Builder's principal or branch offices, but only <br />to the extent such personnel perform tasks directly associated with the Project. <br />7.5.1.4 A multiplier of One Hundred Seventy percent (170%) shall be applied to the wages <br />and salaries of the employees of Design -Builder covered under Sections 7.5.1.1 through 7.5.1.3 hereof to <br />account for employee labor burden, including payroll taxes, pension costs, insurance and other fringe <br />benefits. <br />7.5.1.5 Payments properly made by Design -Builder to Subcontractors and Design <br />Consultants for performance of portions of the Work. <br />7.5.1.6 Costs, including acquisition, transportation, inspection, testing, storage, and <br />handling of materials, furnishings, equipment, and supplies incorporated or reasonably used in completing <br />the Work. <br />7.5.1.7 Costs of removal of debris and waste from the Site. <br />7.5.1.8 All fuel and utility costs incurred in the performance of the Work. <br />7.5.1.9 The cost of defending suits or claims for infringement of patent rights arising from <br />the use of a particular design, process, or product required by Owner, paying legal judgments against <br />Design -Builder resulting from such suits or claims, and paying settlements made with Owner's consent. <br />PROGRESSIVE DESIGN -BUILD CONTRACT, Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.