My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/11/17 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/11/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 8:07:00 PM
Creation date
11/22/2021 8:11:29 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.5.1.10 Deposits which are lost, except to the extent caused by Design -Builder's <br />negligence. <br />7.5.1.11 Costs incurred in preventing damage, injury, or loss in case of an emergency <br />affecting the safety of persons and property except to the extent caused by Design -Builder's negligence. <br />7.5.1.12 Other costs reasonably and properly incurred in the performance of the Work to <br />the extent approved in writing by Owner. <br />7.5.1.13 Site security, temporary fencing, signage and similar security and safety <br />measures for active construction areas. <br />7.5.1.14 Costs for agreed -upon Allowance Items as described and defined in Section 7.7 <br />herein. <br />7.5.2 Non -Reimbursable Costs. The following shall be excluded from the Cost of the Phase 2 <br />Work: <br />7.5.2.1 Compensation for Design -Builder's personnel stationed at Design -Builder's <br />principal or branch offices, except as provided for in connection with Sections 7.5.1.1, 7.5.1.2, and 7.5.1.3, <br />costs associated with Construction General Conditions Work, items intended to be covered by the Design - <br />Build Fee, and Pass -Through Costs. <br />7.5.2.2 General expenses not specifically provided for herein. <br />7.5.2.3 The cost of Design -Builder's capital used in the performance of the Work. <br />7.5.2.4 If the parties have agreed on a GMP, costs that would cause the GMP, as adjusted <br />in accordance with the Contract Documents, to be exceeded. <br />7.5.2.5 Any bonuses or incentive pay that is the obligation of Design -Builder to pay. <br />7.5.3 Pass -Through Costs. The following costs shall be passed through and paid without mark- <br />up or any added Design -Build Fee: <br />7.5.3.1 Premiums for insurance and bonds required by this Contract or the performance <br />of the Work. <br />Work. <br />7.5.3.2 Sales, use, or similar taxes, tariffs, or duties incurred in the performance of the <br />7.5.3.3 Costs for permits, royalties, licenses, tests and inspections. <br />7.5.3.4 Costs for the work of any personnel charged at all-inclusive, market -based billing <br />rates as set forth in Exhibit E. <br />7.6 The Guaranteed Maximum Price. <br />7.6.1 Design -Builder guarantees that it will not exceed any GMP that may be established in the <br />GMP Amendment. Documents used as basis for the GMP shall be identified in the GMP Amendment. <br />Design -Builder does not guarantee any specific line item provided as part of the GMP, provided, however, <br />that it does guarantee the line item(s) for its general project management and general conditions costs <br />("General Conditions Cap"). Design -Builder agrees that it will be responsible for paying the applicable <br />general conditions costs in excess of the General Conditions Cap, as well as be responsible for all costs of <br />PROGRESSIVE DESIGN -BUILD CONTRACT, Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.