Laserfiche WebLink
PAUL J. D <br />COMPANYOF & <br />�4bS-;2018 ;. <br />Date: February 19, 2018 <br />Michael Murray <br />Crown Castle <br />2055 S. Stearman Drive <br />Chandler, AZ 85286 <br />Subject: Structural Analysis Report <br />Carrier Designation: AT&T Mobility Co -Locate <br />Carrier Site Number: <br />Carrier Site Name: <br />Paul J. Ford & Company <br />250 E. Broad St., Suite 600 <br />Columbus, OH 43215 <br />(614) 221-6679 <br />WA6808 <br />Everett Golf & Country <br />Club <br />Crown Castle Designation: Crown Castle BU Number: 823967 <br />Crown Castle Site Name: Everett Monopole <br />Crown Castle JDE Job Number: 483565 <br />Crown Castle Work Order Number: 1526779 <br />Crown Castle Application Number: 423837 Rev. 1 <br />Engineering Firm Designation: Paul J. Ford & Company Project Number: 3751M703.001.7805 <br />Site Data: 6107 Berkshire Dr., Everett, Snohomish County, WA <br />Latitude 470 56' 34.49", Longitude -122° 12' 45.472" <br />127 Foot - Monopole Tower <br />Dear Michael Murray, <br />Paul J. Ford & Company is pleased to submit this "Structural Analysis Report" to determine the structural <br />integrity of the above mentioned tower. This analysis has been performed in accordance with the Crown Castle <br />Structural `Statement of Work' and the terms of Crown Castle Purchase Order Number 1142573, in accordance <br />with application 423837, revision 1. <br />The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we <br />have determined the tower stress level for the structure and foundation, under the following load case, to be: <br />LC5: Existing + Proposed Equipment <br />Note: See Table I and Table II for the proposed and existing loading, respectively. <br />Sufficient Capacity <br />This analysis has been performed in accordance with the 2015 International Building Code based upon an <br />ultimate 3-second gust wind speed of 110 mph converted to a nominal 3-second gust wind speed of 85 mph per <br />section 1609.3.1 as required for use in the ANSI/TIA-222-G-2005 Standard, "Structural Standard for Antenna <br />Supporting Structures and Antennas", with ANSI/TIA-222-G-1-2007 and ANSI/TIA-222-G-2-2009 Addenda per <br />Exception #5 of Section 1609.1.1. Risk Category II, Exposure Category C and Topographic Category 1 were <br />used in this analysis. <br />We at Paul J. Ford & Company appreciate the opportunity of providing our continuing professional services to <br />you and Crown Castle. If you have any questions or need further assistance on this or any other projects <br />please give us a call. <br />Respectfully submitted by: <br />David Jack, E.I.T <br />Structural Designer <br />tnxTower Report - version 7.0.5.1 <br />