My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2720 COLBY AVE COLBY DINER 2022-01-27
>
Address Records
>
COLBY AVE
>
2720
>
COLBY DINER
>
2720 COLBY AVE COLBY DINER 2022-01-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 9:46:57 AM
Creation date
12/9/2021 12:07:46 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2720
Tenant Name
COLBY DINER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />i <br />a <br />IL, <br />2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 <br />Mechanical Summary- MECH-S <br />2015 Washington State Energy Code Com fiance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revi7edlanuga' <br />2017Project <br />Information <br />Project Title: COLBY DINNER <br />Date /2019 <br />Applicant Information. Provide contact information for individual who can respond to <br />For Building Dept. Use <br />inquiries about compliance form information provided. <br />Company Name: COLBY DINNER <br />Company Address: 2720 COLBY AVENUE <br />Applicant Name: COLBY DINNER <br />Applicant Phone: 425-309-6507 <br />Project Description <br />❑ New Building ❑ Building Addition ❑ Tenant Improvement ❑� System Retrofit ❑ No System Changes <br />the fly mechanical systems in <br />the text box provided <br />Installation of a duct less heat pump system for cooling dinner <br />❑ Total Bldg Performance (TBP) <br />This path includes all mandatory <br />provisions per C401.2 Option 2. <br />MECH-SUM, MECH-CHK, and C407 <br />Energy Analysis forms required. <br />❑r Load calculation summary ❑ MECH-LOAD-CALL Form <br />Design Load Calculations <br />Provide design load calculations for ail mechanical systems and equipment serving the building heating, cooling or <br />ventilating needs. If a load calculation summary is provided with the permit documents that includes all applicable <br />compliance information then the 11AECH.-LOAD-CALC form is not required. <br />❑✓ Mechanical Plans ❑ MECH-EQ Forms (TBD) <br />Mechanical Schedules <br />Indicate location of equipment compliance information. If provided on plans then MECH-EQ forms are not required, <br />however, include on plans all applicable compliance information listed in MECH-EQ tables. <br />❑ DOAS is required per C403.6 effective July 1, 2017 (office, retail, education, library and fire station occupancies) <br />All occupied, conditioned areas shall be served by a DOAS that delivers required ventilation air in a manner that does <br />not require space conditioning fan operation,. Space conditioning fans cycled off when no heating or cooling is required. <br />Dedicated Outdoor Air <br />❑ Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS (C403.6, Exception 1) <br />System Requirements and <br />❑ Ventilation and space conditioning provided by a HEVAV system per C403.7 in lieu of DOAS (C403.6, Exception <br />High Efficiency VAV <br />❑ DOAS included in project, although not required (occupancy not office, retail, education, library or fire station) <br />Alternate <br />❑ DOAS related allowances included in project: <br />❑ Prescriptive vertical fenestration maximum area allowance increased to 40 % per C402.4.1.4 with 100 % of <br />conditioned floor area in building served by DOAS. <br />Exception to air economizer per C403.3 Exception 1, include MECH-ECONO form. <br />❑ Project includes HVAC air distribution systems that provide heating and/or cooling <br />if yes, provide a MECH-FANSYS -SUM form. <br />Fan Power <br />❑ For one or more systems, the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp. <br />If yes, provide a seperate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold. <br />Refer to Section C403.2. f 1 and MECH-FANSYS-DOC for requirements and exceptions. <br />❑ Hydronic chilled water ❑ Water -loop heat pump ❑ No hydronic systems <br />HVAC Hydronic Systems <br />❑ Hydronic heating water ❑ Geothermal <br />❑ C406.2 More efficient HVAC equipment and fan systems <br />Requires 90% of heating and cooling capacity to be equipment listed in tables C403.2.3(1)-(9) or air -to -water heat <br />pumps and heat recovery chillers. All equipment listed in tables C403.2.3(1)-(7) must be 15% more efficient than <br />C406 Additional <br />minimum requirements. All stand alone supply, return, and exhaust fans over fhp must have FEQ>_ 71 and must be <br />selected within 10% of maximum total or static pressure. <br />Efficiency Options - <br />❑ C406.6 Dedicated outdoor air system (DOAS) <br />Mechanical <br />Requires 90% of conditioned floor area to be served by a DOAS per C403.6 that delivers required ventilation air in a <br />manner that does not require space conditioning fan operation. <br />❑ C406.7 Reduced energy in service water heating <br />Requires 90% of floor area be in occupancy types listed in C406.7.1 and that 60% of annual hot water energy use <br />be provided by heat pump, waste heat recovery or solar water -heating systems. <br />2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 <br />Mechanical Summary, •• <br />2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 <br />Equipment Type (s) <br />❑ Hot water heating tank(s) ❑ Instantaneous No service water systems <br />Service Water Heating <br />Systems <br />❑ Dedicated boiler ❑ Heat exchange from space heat boiler or <br />central hot water/steam <br />Distribution Type (s) <br />❑ Circulation System ❑ On -demand <br />Commissioning <br />Commissioning is required for: <br />❑ Mechanical systems per C408.2 ❑ Service water heating systems per C408.4 <br />If required, commissioning shall be performed for all applicable systems regardless of individual equipment capacity. <br />Exceptions to commissioning requirements: <br />❑ Total output capacity of all mechanical space conditioning systems in the building do not exceed 240,000 Btu/h <br />cooling or 300,000 Btu/h heating. Mechanical systems commissioning not required. <br />0 Capacity of largest service water heating system in building does not exceed 200,000 Btu/h. Service water heating <br />systems commissioning not required. <br />Low Energy and Semi -Heated Spaces (Note 6 and 7) <br />Peak Space <br />Heating <br />Cooling <br />Conditioning <br />Space <br />Area Served, <br />Capacity, Btu/h <br />Capacity, Btu/h <br />Capacity, <br />Compliance <br />Type <br />Location in Plan(s) <br />Space(s) Served <br />square feet <br />(Note 4) <br />{Note 5) <br />Btu/h-sf <br />Check <br />Notes <br />Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated spaces) in btuh. <br />Note 5 - Provide total installed cooling capacity of system serving Low Energy space(s) in Btulh. Not allowed for semi -heated spaces. Enter 0 if no cooling. <br />Note 6 - Refer to Section C402.1.1 Low Energy Building. Inta/led peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btulh'sf. <br />Note 7 - Refer to Section C402.1.1.1 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 Btulhsf Only systems without <br />electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated. <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.