My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.1 In addition to Owner's other termination rights in the General Conditions to Contract, Owner may <br /> terminate the Contract for convenience. Upon ten (10) days'written notice to Design-Builder, Owner may, <br /> for its convenience and without cause, elect to terminate this Contract or any portion of this Contract. If <br /> Owner terminates the Work or any portion thereof for convenience, Design-Builder shall (subject to the <br /> limitation set forth in Section 8.3 above) be entitled to be paid that portion of the Contract Price that <br /> corresponds to the percentage of completion of Work in accordance with the Contract Documents, plus the <br /> reasonable administrative costs of the termination, but shall not be entitled to any other costs or damages <br /> whatsoever(including without limitation fee or profit on terminated Work). <br /> 9.2 The total sum to be paid to Design-Builder under this Article 9 shall not exceed the Contract Price <br /> as reduced by the amount of payments otherwise made,the price of Work not terminated, and as otherwise <br /> permitted by this Contract. The amounts payable to Design-Builder shall exclude the fair value of property <br /> not under Owner's control which is destroyed, lost, stolen or damaged so as to become undeliverable to <br /> Owner. <br /> 9.3 Any claim, request for equitable adjustment or other demand for extra compensation or time <br /> extension by Design-Builder arising from or related to acts, events, occurrences or omissions prior to the <br /> effective date of the convenience termination shall continue to be subject to and resolved in accordance <br /> with the rules (contractual or legal, express or implied) in effect prior to the termination. The convenience <br /> termination will not convert this Contract into a cost reimbursement contract. <br /> Article 10 <br /> Representatives of the Parties <br /> 10.1 Owner's Representatives. <br /> 10.1.1 Owner designates the individual listed below as its Senior Representative ("Owner's Senior <br /> Representative"), which individual has the authority and responsibility for avoiding and resolving disputes <br /> under Section 10.7.2 of the General Conditions to the extent permitted by the Legal Requirements: <br /> John Nottingham PE, 3200 Cedar St, Everett, WA 98201 <br /> 10.1.2 Owner designates the individual listed below as its Owner's Representative, which <br /> individual has the authority and responsibility set forth in Section 3.3 of the General Conditions to the extent <br /> permitted by the Legal Requirements: <br /> Randy Loveless PE, 3200 Cedar St, Everett, WA 98201 <br /> 10.2 Design-Builder's Representatives. <br /> 10.2.1 Design-Builder designates the individual listed in the table in Section 10.3 below as its <br /> Senior Representative ("Design-Builder's Senior Representative"), which individual has the <br /> authority and responsibility for avoiding and resolving disputes under Section 10.7.2 of the General <br /> Conditions. <br /> 10.2.2 Design-Builder designates the individual listed in the table in Section 10.3 below as its <br /> Design-Builder's Representative, which individual has the authority and responsibility set forth in <br /> Section 2.1.1 of the General Conditions. <br /> 10.3 Key Personnel. Design-Builder has been selected for this Project on the basis of not only its <br /> qualifications as a corporate entity, but also upon the basis of the qualifications of the key personnel it <br /> intends to employ to perform the Work. Design-Builder agrees to provide all professional personnel <br /> PROGRESSIVE DESIGN-BUILD CONTRACT,Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.