My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
necessary, at adequate staffing levels, to perform the required services under this Contract, including the <br /> key personnel identified below: <br /> Position Title Name of Individual <br /> Design-Builder Senior Representative Bill Blankenship <br /> Design-Builder Representative (Project Manager) Will Yoho <br /> Design-Builder Design Manager Michael Lubovich, PE, PMP <br /> Design-Builder Construction Manager/ Dave Sherman <br /> Superintendent <br /> Design-Builder Structural Engineer Polihronis I. Boudaniotis, PE, SE, DBIA <br /> Design-Builder Geotechnical Engineer Lynn Salvati, PhD, PE <br /> These key personnel, all of whom were named in Design-Builder's proposal submitted in response to the <br /> Owner's Request for Qualifications and Proposals for the Project, will be assigned to the Project. Except <br /> in the event of the death of the employee or their termination of employment with Design-Builder, these key <br /> personnel shall remain assigned for the duration of the Project unless otherwise agreed to in writing by the <br /> Owner in its sole discretion. In the event Design-Builder proposes to substitute any of the key personnel <br /> due to death or employment termination, the individual(s) proposed must demonstrate the qualifications <br /> indicated in the Request for Proposals for their respective role(s), and experience as required to <br /> successfully perform such duties. Owner shall have the sole right to determine whether key personnel <br /> proposed as substitutes are qualified to work on the Project. Design-Builder will remove from the Project <br /> any personnel assigned to the Project if, after the matter has been thoroughly considered by Owner and <br /> Design-Builder, Owner considers such removal necessary and in the best interest of the Project, and Owner <br /> so notifies Design-Builder in writing and allows a reasonable period of time for the transition to different <br /> personnel. <br /> 10.4 Key Firms. Design-Builder has been selected for this Project on the basis of not only its <br /> qualifications as a corporate entity, but also upon the basis of the qualifications of the key firms it intends <br /> to engage to perform the Work. Design-Builder agrees to engage such firms to perform the required <br /> services under this Contract, including the key firms identified below: <br /> Firm Role <br /> James W. Fowler Co. Design-Builder, General Contractor <br /> Kennedy Jenks Consultants, Inc. Design, Engineer of Record <br /> McMillen Jacobs Associates Geotechnical Engineering <br /> These key firms, all of whom were named in Design-Builder proposal submitted in response to the Owner's <br /> Request for Qualifications and Proposals for the Project, will be engaged on the Project. These key firms <br /> shall be engaged for the complete scope identified in the Design-Builder's proposal. In the event Design- <br /> Builder proposes to substitute any of the key firms, Design-Builder shall demonstrate that the replacement <br /> firm possesses sufficient qualifications to perform the Work in question. Owner shall have the sole right to <br /> determine whether key firm proposed as substitutes is qualified to work on the Project. <br /> Article 11 <br /> Bonds and Insurance <br /> PROGRESSIVE DESIGN-BUILD CONTRACT,Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.