City of Everett,Washington I Reservoir 3 Structural Improvements PDB Project
<br /> Progressive Design-Build Contract I Exhibit A.List of Reference Documents
<br /> — Determining dimensions for which accuracy is critical in determining suitable fit-up
<br /> tolerances, worker access, equipment access and operation, purchased or fabricated
<br /> materials dimensions, and/or construction means and methods.
<br /> • Reference Documents 5, 7, 8, 9 and 10, as numbered in the table below, are provided to
<br /> the Design-Builder for information only, and cannot be relied on by the Design-Builder.
<br /> • Reference Document 11, as numbered in the table below, may be relied on the Design-
<br /> Builder for identifying required reservoir cleaning procedures.
<br /> • Reference Document 12, as numbered in the table below, is provided for Design-Builder
<br /> information only, and may not be relied on. The Design-Builder is expected to conduct
<br /> any required geotechnical investigations needed to support their design.
<br /> Document
<br /> Document Title
<br /> Number
<br /> 1 Plans for Reservoir No.3, Water Department of Everett, Washington, 1923.
<br /> 2 Reservoirs No.3 and 5 Cover Construction (Part 1), James M. Montgomery
<br /> Consulting Engineers, Inc., 1987.
<br /> 3 Reservoirs No.3 and 5 Cover Construction (Part 2), James M. Montgomery
<br /> Consulting Engineers, Inc., 1987.
<br /> 4 Reservoirs No. 3 and 5 Cover Construction Shop Drawings, Supercrete, 1987.
<br /> 5 Reservoirs No. 3 and 5 Structural Design Report, Andersen, Bjornstad, Kane,
<br /> Jacobs, Inc. Consulting Engineers, 1987.
<br /> 6 Reservoir No. 3 Re-Lining Project Plans, MWH, 2009.
<br /> 7 City of Everett Reservoir#3 Valve Vault Platform Replacement, C.G. Engineering,
<br /> October 2019.
<br /> 8 Roof Assessment Report, Everett Reservoir#3, C.G. Engineering, October 2019.
<br /> 9 Reservoir 3 Cover Repairs, Draft 90% Plans, C.G. Engineering, April 2020.
<br /> 10 Reservoir 3 Site Map, City of Everett, April 2021.
<br /> 11 Reservoir 3 Washdown Procedure, City of Everett, April 2021.
<br /> 12 Report on Geotechnical Exploration, Reservoir Cover Design Project Reservoir
<br /> Numbers 2, 3, and 5, dated February 9, 1987